PAGE 5
Add: Floor3,Building A,No.257,Junye Road,Huangpu District,Guangzhou,China
E-mail:[email protected] Http://www.bevsinfo.com
3. Operation
3.1
Determine if coated face is to be up or down or both.
3.2
Set height for impactor to drop, by loosening the two small knurled clamp screws either
side of the release mechanism mounted on the tube, and slide to the required height (the
lower face of the mechanism is the datum face), then tighten the two screws.
3.3
Raise the falling weight using the falling weight lifting knob, rotate the release ring
handle to capture the falling weight at the required height.
3.4
Rotary impact depth indication ring into the die holder to the desired depth.
3.5 Loosen the test board locking ring, put test board onto the mold base, and then lock test
board.
3.6
Stubbs release handles, so that the impact hammer to free-fall impact test board.
4. Routine Maintenance
4.1 When instrument is not in use keep anvil lightly oiled to prevent corrosion.
4.2 Keep instrument clean.
4.3 Check fixing bolts are still secure.
4.4 Check falling weight lifting knob and handle are secure.
4.5 Check clamp pads are still serviceable.
5. Packing List
* Host 1
* Mold base 1
* Impact hammer 1
* Collar group 1 set
* Certificate 1
* Manual 1