background image

 

 

PAGE 5 

Add: Floor3,Building A,No.257,Junye Road,Huangpu District,Guangzhou,China 
E-mail:[email protected]                                                                  Http://www.bevsinfo.com 

 
 
 

3. Operation 

3.1   

Determine if coated face is to be up or down or both. 

3.2 

Set height for impactor to drop, by loosening the two small knurled clamp screws either 
side of the release mechanism mounted on the tube, and slide to the required height (the 
lower face of the mechanism is the datum face), then tighten the two screws. 

3.3 

Raise  the  falling  weight  using  the  falling  weight  lifting  knob,  rotate  the  release  ring 

 

handle to capture the falling weight at the required height. 

3.4     

   

Rotary impact depth indication ring into the die holder to the desired depth. 

3.5        Loosen  the  test  board  locking  ring,  put  test  board  onto  the  mold  base,  and  then  lock  test 

board. 

3.6   

Stubbs release handles, so that the impact hammer to free-fall impact test board. 

4. Routine Maintenance 

4.1  When instrument is not in use keep anvil lightly oiled to prevent corrosion. 
4.2  Keep instrument clean. 
4.3  Check fixing bolts are still secure. 
4.4  Check falling weight lifting knob and handle are secure. 
4.5  Check clamp pads are still serviceable. 

5. Packing List 

* Host 1 

    * Mold base 1 
    * Impact hammer 1 
    * Collar group 1 set 
    * Certificate 1 
    * Manual 1 

Отзывы: