Bettersafe Walk Angel Скачать руководство пользователя страница 6

Installation Manual

June 2016: rev 1.2

6

Installation on Standing Seam type roof sheet

1. Long support extruded Walk Angel I-beams

should be placed across the length of the
walkway section and perpendicular to the
profile direction

2. uPVC Walk Angel Boards should be mounted

in the “short” orientation between the
beams, in line with to the profile.

3. The beams shall then be fixed to support ‘L’

brackets using the fixings provided.

4. Each bracket shall then be fixed to the

roofing seams using Walk Angel Standing
Seam Clamps.

5. The fixings should be between 600 and

1200mm centres.

Across the profile

Содержание Walk Angel

Страница 1: ...Installation Manual June 2016 rev 1 2 Installation Technical and Maintenance Manual June2016 Revision 1 2...

Страница 2: ...as an attachment point for fall protection PPE The equipment used should be stored in a safe manner and moved to the point of installation in line with the Manual Handling Regulations in the region o...

Страница 3: ...e easily removed to allow routine maintenance Walk and visually inspect the complete installed system in relation to the general client s needs Establish if any modifications and or additional product...

Страница 4: ...icular to the profile direction 2 uPVC Walk Angel Boards are mounted in the short orientation between the beams in line with the profile 3 The beams shall then be fixed to the crowns of the profile us...

Страница 5: ...o the profile direction 2 uPVC Walk Angel Boards are mounted in the long orientation between the beams in line with the profile 3 The beams shall then be fixed to the crowns of the profile using M6 st...

Страница 6: ...ndicular to the profile direction 2 uPVC Walk Angel Boards should be mounted in the short orientation between the beams in line with to the profile 3 The beams shall then be fixed to support L bracket...

Страница 7: ...rpendicular to the profile direction 2 uPVC Walk Angel Boards should be mounted in the long orientation between the beams in line with the profile 3 The beams shall then be fixed to support L brackets...

Страница 8: ...he two outer boards lengths of 23mm Stainless Steel Round Bar is inserted to provide ballast 3 The weighted sections should be separated by a non weighted section 4 Sections of walkway should then be...

Страница 9: ...Installation Manual June 2016 rev 1 2 9 Supports 1 I Beams made from extruded plastics 2 Levelling using I Beams are manufactured per installation based on the roof pitch as specified by the customer...

Страница 10: ...Installation Manual June 2016 rev 1 2 10 Steps 1 Steps shown are for illustration purposes only 2 Steps are fabricated to suit individual profiles of roof...

Страница 11: ...Installation Manual June 2016 rev 1 2 11 Fixings Standing Seam Clamp Tek Screw...

Страница 12: ...Installation Manual June 2016 rev 1 2 12 Fixings Joiner...

Страница 13: ...info bettersafeinternational com www bettersafeinternational com UK Riverside Mountbatten Way Congleton Cheshire CW12 1DY United Kingdom t 44 0 1260 217 437 NETHERLANDS Azewijnseweg 12 SF 4214 KC Vur...