4
Installation
Please note:
Before starting any installation, turn off the water supply.
Please note:
Before commencing any installation, the desired location should be checked
before drilling, that no pipes or wires can be damaged.
First, prepare the water supply pipes to match up with the towel radiator and valve
dimensions being used. Fit the radiator valve tail and nut into the towel rail (not supplied)
(at both sides) and using sealing tape, tighten into position, then follow the installation
below.
1. Fit the blanking cap and air vent in the top of the rail, (add a little sealer tape to
secure) and tighten using the spanner, be sure not to overtighten.
2. The rear of the towel rail has four location holes to fix the brackets. Measure the
distance between all the location holes and mark these on the wall in the required
location, use a spirit level to ensure these are horizontally and vertically aligned.