2.
14.
FACE FIT
, attach the side channel with the snap in recess facing outwards directly below pelmet. Pre-Drill
holes through in-fill part of the channel. Place channel against post/wall and mark holes
15. Pre-drill all holes and plug if needed. When all holes are drilled, position the channels, and fasten with
appropriate fixings. Repeat these steps for other the channel.
16.
REVEAL FIT,
attach the side channel to the inside of the post/wall, with the snap in recess facing backwards
and directly below pelmet. Pre-Drill holes through the channel. Place channel against post/wall and mark holes
17. Pre-drill all holes and plug if needed. When all holes are drilled, position the channels, and fasten with
appropriate fixings. Repeat these steps for other the channel
The Spring has been tensioned in the factory but may need to be adjusted onsite.
18. ADJUSTING SPRING: Take semi cassette front cover off by removing screws. Lock spring and lift awning out
of cassette slightly. Attach a shifter to the Pin. Wind the shifter clockwise to apply tension. Use the size chart to
determine how many turns of tension are required.
Link to Spring Chart Tension Below
.
refer to picture 2.
Do
NOT
let go of the shifter while tensioning as the spring has a lot of force in it. Do
NOT
try and over tension
the spring. When the right amount of tension has been applied, drop the holding tab down and wind the spring
back until it engages the pin.
19. If FACE fit snap the infill cover plate into the recess
refer to picture 3
20. Twist bottom rail to release and roll down and test operation.
21. Close cassette
Caution: Like all outdoor blinds, it is prudent to retract the blind in the presence of strong winds.
Spring Tension Chart
https://www.betta-blinds.com.au/downloads/installation_guides/Spring%20Pretensioning%20Chart.pdf