46
1. Check the cleanliness and functionality of the solution fill hose and the solu-
tion cap measuring cup.
2. Check the cleanliness and seal of the solution filter.
3. Fill up the solution tank.
4. Check the hose connections for leaking, check the solenoid valve for proper
operation, and check the solution flow control valve.
5. Verify that when the valve is open, solution will continuously flow on the
floor.
6. Check the solution drain hose valve, ensure that it can open and close prop-
erly.
PLUMBING INSTALLATION CHECKS
Содержание STEALTH DRS21BT MicroRider
Страница 10: ...10 SQUEEGEE SUPPORT ASSEMBLY DIAGRAM 2 13 6 10 15 8 3 7 4 14 8 5 16 1 9 17 12 18 17 13 10 9 11 11 12 ...
Страница 16: ...16 STEERING WHEEL ASSEMBLY DIAGRAM 14 5 15 11 4 6 9 12 7 1 5 16 5 13 8 6 10 6 6 3 2 ...
Страница 18: ...18 FRONT WHEEL ASSEMBLY DIAGRAM 1 13 1 4 7 2 8 4 7 2 12 5 9 6 10 3 11 ...
Страница 22: ...22 SOLUTION TANK ASSEMBLY DIAGRAM 4 7 6 16 10 5 8 4 6 11 15 1 13 12 18 2 3 17 9 14 19 ...
Страница 28: ...28 ELECTRICAL COMPONENTS DIAGRAM 3 2 8 9 4 7 6 5 10 11 1 ...
Страница 30: ...30 OPTIONAL SPLASH SKIRT ASSEMBLY DIAGRAM 3 8 5 4 4 1 2 3 4 4 4 3 4 6 1 2 7 3 4 4 ...
Страница 49: ...49 4 Check the connections of the vacuum hose to the recovery tank and the squeegee assembly VACUUM ADJUSTMENT ...