10/2
0
5. TO CONTINUE
Once the first 30 linear meter are installed
properly, untension the tension comb and the
belt/rope.
Connect 2 or 3 new rolls on the first end and
tension by means of the tension comb, the belt
and the excavator.
Always check the distance between welded mesh
and ground level and make yourself pleased with
the tension on the welded mesh before fixing.
Always fix the mesh first on the tension units
(step 6 each +/- 30 linear meter) and later on the
intermediate posts (step 7) .
6. SUPPLEMENTARY FIXATION
Supplementary double tie wire can be added afterwards and knotted on the
inside of the property. We advice once at the top, once at the bottom and once in
the middle of the welded mesh.
Installation Guide Fortinet
Protect
–
December 2019