8
P6019ASS16
P6019ASS16
B
A
B
A
A
B
A
B
A
B
P61318ASS16
P6680ASS16
B
A
P6124ASS16
B
A
1
2
3
4
390
127
390
250
127
2-M8 bolt
2-M8 nut
NOTE:
It is important to ensure all elements: Hoses, Debris Screens and Inlet/Outlet Valves are properly aligned.
OPERATION
1) Open/unscrew the Air Purge Valve on the top of the Filter Pump; air is released as water fills the Filter Pump.
NOTE:
If knob should become dislodged, simply place it back into the hole and turn clockwise to rethread air purge valve.
2) When water comes out of the Air Purge Valve screw it closed and wipe away any water.
3) Test the GFCI plug.
PEDESTAL FIXING
The filter pump must be vertically fixed on ground or a certain pedestal made of wood or concrete before use. There should
be two holes 9mm in diameter on the pedestal, the space between which should be 127mm. Put filter pump on the pedestal
and fix them together by fasten the bolts and nuts. All the pedestal parts should weigh over 18kgs at least to prevent the
pump from accidentally falling.
NOTE:
It is imperative to check that the hydraulic connectors are not closed.