66
Twist off the blue cap on the tank
in order to reach the valve located
behind it.
An air pump with a built-in mano-
meter or a compressor is ideal for
monitoring/setting the air pressure
in the stored pressure tank. Pump
the tank to a pressure of 0.3 - 0.5
bar.
The air pressure in the tank is now
set. Now screw the blue cap back
onto the valve.
Remove the back cover of the Jung-
brunnen 33-00 ULTIMATE to reach
the internal stored pressure tank.
Now you must dismantle the stop-
cock of the internal stored pressu-
re tank. Fasten the connecting ring
tightly against the connector and
pull the stopcock with hose out from
the connector. Refer to the images
on page 40 should you experience
any diffi culties.
You will fi nd a blue cap with a valve
beneath it on the underside of the
stored pressure tank.
Maintaining the BestWater System 33-00 ULTIMATE
EN
Содержание Jungbrunnen 33-00 ULTIMATE
Страница 38: ...38 Datum Art der Wartung Stempel N chster Termin DE Wartungstabelle...
Страница 39: ...39 Datum Art der Wartung Stempel N chster Termin Wartungstabelle DE...
Страница 40: ...40 Datum Art der Wartung Stempel N chster Termin Wartungstabelle DE...
Страница 76: ...76 Date Type of maint Stamp Next appt Maintenance Table EN...
Страница 77: ...77 Date Type of maint Stamp Next appt Maintenance Table EN...
Страница 78: ...78 Date Type of maint Stamp Next appt Maintenance Table EN...
Страница 79: ...79 Date Type of maint Stamp Next appt Maintenance Table EN...