background image

Reorder #FORM1091

 4/18

Bestbath is a registered trademark of Best Bath Systems Inc.  

© 2018 Best Bath Systems Inc. All rights reserved. 

Escape Series Walk-in Bathtub

I N S T A L L A T I O N   I N S T R U C T I O N S  

( C O N T I N U E D )

6

Figure 9

Check that the 

tub is level

1

Screw the back and side 

nailing flange to the studs

2

Make final connections at drain and 

at hot and cold supply lines

3

Attach the cable/

lanyard to magnet 

screw and nut to 

meet code

4

Figure 10

Check that the 

tub is level

1

Screw the back nailing 

flange to the studs

2

Make final connections at drain 

and at hot and cold supply lines

3

Attach the cable/

lanyard to magnet 

screw and nut to 

meet code

4

Figure 11

 STEP 4: 

  

FINAL INSTALLATION

1.  With all plumbing and electrical preparations complete 

and the floor clean, double-check the tubing or wires to 

ensure none have come loose. Then move the tub into 

final position.

2.  Place a level on the flat part of the deck in both directions 

to check for level. 

3.  Pre-drill holes in the nailing flange and screw to the studs.
4.  Make the final drain connection and hook up the hot and 

cold supply lines.

5.  Before filling the tub with water, use a damp soft cloth to 

wipe down the door seal as well as the surface in the door 

jamb where it comes in contact with the seal. See 

Figure 

on page 3 for how to adjust pressure at the door seal.

 

Note: 

For the initial startup make sure the seal, door jamb 

and door are dry. Although each tub is water tested at the 

factory, it is the installer’s responsibility to water test after 

installation. 

Testing at this stage is critical

 to ensure 

nothing happened during shipping, handling or installation 

that may result in a leak or poor seal.

6.  Fill the tub, wait five minutes and then check for leaks at 

the door hinge, around the door seal and at all fittings 

and connections.

7.  Turn the pump and/or blower on using the keypads 

inside the tub and let it run for at least five minutes. 

Check for leaks while the pump/blower is running and 

check again five minutes after it has been turned off. In 

places where a visual check is not possible, check for 

leaks by hand.

8.  Adjust the temperature of the fill water to a level that is 

safe, taking into consideration any physical limitations the 

end user may have.

9.  Attach the cable/lanyard to the magnet’s screw and nut 

on the inside of access hole to meet code.

10.  Reinstall the access panels.

Alcove 

Installation

Check that the 

tub is level

1

Make final connections at drain 

and at hot and cold supply lines

3

Screw the back and side 

nailing flange to the studs

2

Attach the cable/

lanyard to magnet 

screw and nut to 

meet code

4

Corner 

Installation

Straight Wall 

Installation

Bestbath

®

 water, air and microbubble jet bathtubs may be equipped with a water mixing valve. 

The desired valve settings must be completed by the installer. 

 

Resetting or tampering with the valve mechanism may lead to serious injury. Refer to the temperature setting instructions supplied with the valves.

!

Отзывы: