Step 11A
Assemble Gables
32-1/2" Long 2x4s
49-1/2"
Long 2x4
Right Pre-built
Gable Frame
1x4 Block MUST
be Positioned Here
and Another on
Opposite Side
Gable Stud
Detail 'A'
Temporary
1x4 blocks
5-3/4"x14"
Gusset
,<
Y5;2+:(8:+H@"#$;('5@$+(+&%(A:54+3?(W,X(7&+($+A;(5&%(W,X(:#'2;?(W,X(7&+(_^H,d-e($7&'(-/_(5&%(W-X
;>7(f-H,d-e($7&'(-/_3(>#;2(5&'$+%(+&%3<
-<
N73#;#7&(;2+3+(67487&+&;3(;7'+;2+:(53(327>&(@+$7><(\2+&(5$#'&+%(67::+6;$9(;2+(@7;;74(-/_3
>#$$(@+(3;:5#'2;(5&%(4+53":+(,-.HGe(A:74(+&%(;7(+&%<(
Pre-built gable ends highlighted in gray.
f<
1+487:5:#$9(;56P(,/_(@$76P3(;7($7A;(A$77:#&'(5:7"&%(;2+(A:54+(4+4@+:3<(12+3+(@$76P3(>#$$(@+
KeH,-e $7&' 5&% 459 25V+ 5&'$+% +&%3< I5P+ 3":+ W-X ;>7 7A ;2+3+ @$76P3 5:+ 873#;#7&+% #&3#%+
+562(8:+H@"#$;('5@$+(+&%(A:54+(53(327>&<(N73#;#7&(;2+(:+3;(7A(;2+(@$76P3(588:78:#5;+$9(3856+%
;7(27$%(-/_3(#&(8$56+<(12+3+(>#$$(#&3":+(;25;(5$$(;:"33+3(5&%('5@$+3(5:+(@"#$;(+/56;$9(;2+(354+<
US(ZS1(&5#$(@$76P3(;7('5@$+<
_<
)+6":+(;2+(@7;;74(-/_(;7(;2+('5@$+(3;"%("3#&'(W-X(;>7(-H,d-e(36:+>3<
M<
D765;+ W-X ;>7 MHfd_e/,_e S)! '"33+;3< L;;562 ;2+3+ ;7 ;78 7A +562 '5@$+ 3;"% ;7 3+6":+ A:54+
;7(f-H,d-e(-/_3<(=3+(0%(67447&(&5#$3<()++(U+;5#$(.L.<