26
| English
1 609 92A 0ER • 26.11.13
In this case, interrupt the cutting process and allow
the diamond cutting disc to cool by running the
machine for a short time at maximum speed with
no load.
Noticeable decreasing work progress and circular
sparking are indications of a diamond cutting disc
that has become dull. Briefly cutting into abrasive
material (e. g. lime-sand brick) can resharpen the
disc again.
Information on Structures
Slots in structural walls are subject to the Standard
DIN 1053 Part 1, or country-specific regulations.
These regulations are to be observed under all cir-
cumstances. Before beginning work, consult the
responsible structural engineer, architect or the
construction supervisor.
Maintenance and Service
Maintenance and Cleaning
Before any work on the machine itself, pull the
mains plug.
For safe and proper working, always keep the
machine and ventilation slots clean.
In extreme conditions, always use dust extrac-
tion as far as possible. Blow out ventilation
slots frequently and install a residual current
device (RCD).
When working metals, conductive
dust can settle in the interior of the power tool.
The total insulation of the power tool can be im-
paired.
Please store and handle the accessory(-ies)
carefully.
If the supply cord is damaged, it must be replaced
by the manufacturer, its service agent or similarly
qualified persons in order to avoid a hazard.
In all correspondence and spare parts orders,
please always include the 6-digit order number giv-
en on the nameplate of the machine.
Disposal
The machine, accessories and packaging should
be sorted for environmental-friendly recycling.
Do not dispose of power tools into household
waste!
Only for EC countries:
According to the European Directive
2012/19/EU for Waste Electrical
and Electronic Equipment and its
implementation into national right,
power tools that are no longer usa-
ble must be collected separately and
disposed of in an environmentally correct manner.
Subject to change without notice.
OBJ_BUCH-361-002.book Page 26 Tuesday, November 26, 2013 5:58 PM
Содержание 043564
Страница 3: ...3 1 609 92A 0ER 27 11 13 OBJ_BUCH 361 002 book Page 3 Wednesday November 27 2013 9 02 AM...
Страница 122: ...122 E 1 609 92A 0ER 26 11 13 FI RCD OBJ_BUCH 361 002 book Page 122 Tuesday November 26 2013 5 58 PM...
Страница 123: ...E 123 1 609 92A 0ER 26 11 13 Service OBJ_BUCH 361 002 book Page 123 Tuesday November 26 2013 5 58 PM...
Страница 124: ...124 E 1 609 92A 0ER 26 11 13 H OBJ_BUCH 361 002 book Page 124 Tuesday November 26 2013 5 58 PM...
Страница 125: ...E 125 1 609 92A 0ER 26 11 13 OBJ_BUCH 361 002 book Page 125 Tuesday November 26 2013 5 58 PM...
Страница 133: ...E 133 1 609 92A 0ER 26 11 13 2012 19 EE OBJ_BUCH 361 002 book Page 133 Tuesday November 26 2013 5 58 PM...
Страница 187: ...187 1 609 92A 0ER 26 11 13 OBJ_BUCH 361 002 book Page 187 Tuesday November 26 2013 5 58 PM...
Страница 188: ...188 1 609 92A 0ER 26 11 13 OBJ_BUCH 361 002 book Page 188 Tuesday November 26 2013 5 58 PM...
Страница 189: ...189 1 609 92A 0ER 26 11 13 OBJ_BUCH 361 002 book Page 189 Tuesday November 26 2013 5 58 PM...
Страница 190: ...190 1 609 92A 0ER 26 11 13 OBJ_BUCH 361 002 book Page 190 Tuesday November 26 2013 5 58 PM...