The quartz-controlled signal system type MPB 1400 can be used for controlling
traffic in construction sites with alternating one-way traffic, at T-junctions or
crossroads.
The length of the red and green phases can be adjusted differently right down to the
last second for all signals – so versatile is this new system!
For initial commissioning, please proceed as follows:
1.)
Provide the signal head with 12 VDC operating voltage by placing the
batteries or N1 type power supply units in the battery casing. Pay
attention to correct polarity! The signal heads switch on automatically
(electronic on/off switch).
2.)
The signals now show "flashing yellow".
3.)
If the signals have been placed next to each other for commissioning,
please make sure that they are spaced at intervals of approx. 3 metres.
This ensures that the infrared signals of the hand box can be unequi-
vocally allocated to each individual signal..
Data can be entered in the hand box at any point in time, even in a different space and
time from the signals themselves. Please proceed as follows:
1.)
Press "ON" to switch the hand box on.
Press "ON" again and hold for 2 seconds to switch the display back
lighting on if required.
2.)
The hand box introduces itself:
Then the display shows the menu point >Choose<.
Press "1" and "3" to change values or make a selection (left/right). Use "2" and "4" to
move through the menu. "2" takes you back and "4" moves you forward in the menu,
and is used to confirm your inputs.
Alternating one-way traffic:
2
Choose < >
One-way
Signal system type MPB 1400
V.1.00c
Содержание MPB 1400
Страница 1: ...Operating Instructions Construction Site Traffic Signal System MPB 1400 GB ...
Страница 2: ......
Страница 17: ...15 ...
Страница 19: ......
Страница 20: ...11 2015 ...