
54
10.
After all pages data are uploaded, “Read System Data” is completed.
11.
After completing “Read System Data,” there is a folder named “Read Data” added in the
selected folder before.
12.
A file named “Scaler.dat” including adjustment data of projector is added in the “Read Data”
folder.
13.
Turn off projector and the service tool, and then download a new firmware.
(2) Write Data From Main Board to Projector:
14.
After completing firmware download, open the service tool, and connect PC and Projector by
RS232 cable.
15.
[Case1] : If Main Board is changed to new one, tick the “Change Main Board” item.
(Note)
[Case2] : If only FW re-download without changing M/B, No Need to tick the “Change
Main Board” item.
(Note: Since M/B service part has initial ADC calibration data from factory, when the “Change Main Board”
is ticked, the “ADC Calibration Data” will be kept as the initial data in new M/B and will not cover by the data
from old M/B.)
Содержание SX930
Страница 3: ...3 Update History Revision Chapter Changes Date Rev 00a Initial version 2015 9 21 ...
Страница 27: ...27 Remote Control Function and Key Code Definition Detail See Appendix2 ...
Страница 29: ...29 CTN LBL PRINTING 1 For 9H JEG77 15A Actual Date ...
Страница 30: ...30 3 For 9H JEG77 15E 15U Actual Date Actual Date ...
Страница 31: ...31 4 For 9H JEG77 15T Actual Date ...
Страница 32: ...32 SPEC LBL PRINTING 1 For 9H JEG77 15X exclude 9H JEG77 15C ...
Страница 33: ...33 2 For 9H JEG77 15E ...
Страница 34: ...34 LAMP LBL PRINTING ...
Страница 72: ...72 Page1 Page2 ...
Страница 73: ...73 Page3 Page4 ...
Страница 74: ...74 Page5 Page6 ...
Страница 75: ...75 Page7 ...
Страница 84: ...84 5 Level 2 Circuit Board and Standard Parts Replacement 5 1 Product ExplodedView Module 1 Total ExplodedView ...
Страница 85: ...85 ...
Страница 86: ...86 Module 2 ASSY UPPER CASE ...
Страница 87: ...87 Module 3 ASSY LOWER CASE ...
Страница 98: ...98 48 Disassemble the wire BST to MB 49 Disassemble the grounding wire 50 53 Disassemble the grounding wire ...
Страница 99: ...99 51 Disassemble the grounding wire 52 Disassemble EMI board 53 Disassemble the wire ESD board to PWR ...
Страница 100: ...100 54 Disassemble the BKT EMI BD 55 EMI BD 56 Disassemble the lamp box 57 61 Disassemble the stand off ...
Страница 102: ...102 63 Disassemble the wire dresser 64 Disassemble the sponge 65 Lower case ...
Страница 107: ...107 Fig 2 7 Fig 2 8 Fig 2 9 Fig 2 10 Fig 2 11 Fig 2 12 Sponge FM DTM FM Clip FM Paste Mylar Align Edge Clip FM2 ...
Страница 125: ...125 9 2 assemble 4 fan 9225 please notice the air flow directions 9 3 paste sponge on lamp fan ...
Страница 127: ...127 10 2 assemble the front case and plug the IR connector 10 3 assemble zoom focus ring Screw 1 ...
Страница 128: ...128 10 4 assemble the rear case 10 Assemble lamp module 8R0 screw 3 Stand off 8F VG564 8R0 ...
Страница 132: ...132 13 Paste the label of logo 14 Assemble RING FOCUS and lock well Fig 9 5 3A 1W801 001 ...
Страница 135: ...135 Chapter 1 System Analysis ...
Страница 144: ...144 ...
Страница 156: ...156 Appendix 3 Ceiling Mount Drawing ...