manualshive.com logo in svg
background image

    
    
    
    
    
    
    
    

    
    

 

B

B

e

e

n

n

Q

Q

 

 

S

S

o

o

l

l

a

a

r

r

 

 

P

P

h

h

o

o

t

t

o

o

v

v

o

o

l

l

t

t

a

a

i

i

c

c

 

 

M

M

o

o

d

d

u

u

l

l

e

e

s

s

 

 

(

(

I

I

E

E

C

C

,

,

 

 

E

E

T

T

L

L

)

)

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

PM220P00 / PM240P00   
Installation Guide for Users

 

Содержание PM220P00

Страница 1: ...B Be en nQ Q S So ol la ar r P Ph ho ot to ov vo ol lt ta ai ic c M Mo od du ul le es s I IE EC C E ET TL L PM220P00 PM240P00 Installation Guide for Users...

Страница 2: ...ncluding but not limited to installation application or removal by any party other than a qualified personnel non observance of BenQ Solar s installation users and or maintenance instructions repair o...

Страница 3: ...modules Damaged modules broken glass torn back sheet broken j boxes broken connectors etc can be electrical hazards as well as laceration hazards Contact with damaged module surfaces or module frame c...

Страница 4: ...iation the temperature of the cells and the equipment to which they are connected a PV module will generate a different current and voltage levels which result in a different power output Grounding Be...

Страница 5: ...uld void the warranty Use corrosion proof fastening materials For PM220P00 and PM240P00 modules four stainless steel bolts with nuts washers and lock washers are recommended per module Only the existi...

Страница 6: ...Last revised December 2011 5 BenQ Solar Figure 2 Installation of module Figure 3 Effective mounting area clamping...

Страница 7: ...ge or adjustment on the cable of Junction Box D D D DO O O O NOT NOT NOT NOT disconnect cable by yourself Important The cable must not be bent or crushed on the direct exit of the cable screw joint A...

Страница 8: ...the southern hemisphere The module must be installed so that air can freely circulate around it The cells working temperature will thus be reduced and consequently the module s performance will be en...

Страница 9: ...the PV conductor which cross section is 4 mm2 External connection boxes will be used to enable greater cable cross section area for long distance transmission The modules are qualified for the applic...

Страница 10: ...g Inspection of connections and cabling Perform preventive maintenance every 6 months carrying out the following operations Check the tightness and condition of the connection cable junctions Check th...

Отзывы: