Do not concentrate sunlight or other artificial light sources onto the module. 

 

Use tools duly coated with insulating material while working with the modules. 

 

Always work under dry conditions. 

 

Do  not  install  the  modules  where  there  may  be  flammable  gases  or  vapors,  since 

sparks may be produced. 

 

Take care to avoid electric discharges when installing, wiring, starting up or carrying 

out maintenance work on the modules. 

 

Do not touch the terminals while the module is exposed to light.   

 

Install with suitable protection to redirect a discharge of 30 or more direct current 

volts to if delivered any person on the installation team. 

 

Please prevent adherent of oil such as paraffin liquid, animal oil and vegetable oil form 

molding  parts.  It  may  be  cracked  or  broken  and  loose  the  performance of  Junction 

Box and connectors. 

 

4.2 Module Grounding   

BenQ Solar PV modules have a clearly marked grounding hole on each side of the frame for 
inserting the ground contact. The grounding screw and bolt are usually sold separately from 
the mounting equipment. 
 
Please  make  sure  the  grounding  screw  breaks  the  anodized  surface  of  the  module  frame 
around  the  holes.  Another  option  is  to  scratch  off  the  anodizing  before  the  grounding 
connection is made.    The frame is fully insulated by the anodizaiton process, so this step is 
essential for proper ground contact.. 
 
An anti-oxidation compound should be applied to the bare aluminum surface for protection. 
Use a layer of insulation if the support structure material is different than the frame material 
(aluminum) to prevent galvanic corrosion. 
 
If the support structure is a non conductor, a dedicated ground cable must be connected to 
each  module  frame  by  means  of  a  suitable  fastening  system.  The  fastening  system  must  be 
splicedwith  a  cable  that  has  a  minimum  diameter  of  2.5mm

2

..  Please  make  sure  that  each 

module is grounded properly per local municipal requirements. The recommended assembly 
of grounding screw is shown below in Figure 5. 
 

Note: When using a Tapping Screw for grounding, the cap washer is used for buffer only and can substituted by 

any M4-M4.5 washer.                                                           

Содержание Back contact 96 cells Series

Страница 1: ...s 60 cells series 60 cells series PM250M01 PM250M01 PM250M01 PM250M01 PM060M02 PM060M02 PM060M02 PM060M02 Mo Mo Mo Mono no no no 60 cells with light weight series 60 cells with light weight series 60...

Страница 2: ...1 Series 8 2 7 PM072P00 Series 8 2 8 PM060P00 Series 9 2 9 PM096B00 Series 9 Chapter 3 Mounting Guidelines Chapter 3 Mounting Guidelines Chapter 3 Mounting Guidelines Chapter 3 Mounting Guidelines 10...

Страница 3: ...Certifications See BenQ Solar Limited Warranty document for full product warranty details and limitations Product Warranty version is based on warranty note in effect at the time of product manufactur...

Страница 4: ...I LIFTING AND HANDLING NG AND HANDLING NG AND HANDLING NG AND HANDLING Do not lift the module or carry module by junction box or PV cables Do not drill holes in the frame This will void warranty and m...

Страница 5: ...in order to prevent untrained persons from disconnecting the modules once installed There are no serviceable parts within the module Do not attempt to change or repair any part of the module Damaged m...

Страница 6: ...ing the modules do not allow the anodized profiles frames to come into contact with contaminants such as cement or mortar which will cause damage to the anodic oxide coatings A A A Always contact your...

Страница 7: ...ductor capacities fuse sizes and size of controls connected to PV output An additional 1 25 multiplier may be required by the NEC for sizing fuses and conductors as described in the NEC section 690 8...

Страница 8: ...Weight Module Weight Module Weight 18 5 kg 41 1 lbs Power 240W 245W 250W 255W 260W Efficiency 14 9 15 2 15 5 15 8 16 1 Vmp V 29 9 30 3 30 6 30 8 31 2 Imp A 8 03 8 09 8 17 8 28 8 34 Voc V 37 0 37 2 37...

Страница 9: ...L x W x H s L x W x H s L x W x H 1639 x 983 x 35 mm 64 52 x 38 7 x 1 38 in Module Weight Module Weight Module Weight Module Weight 10 5 kg 23 3 lbs Power 265W 270W 275W 280W 285W 290W Efficiency 16...

Страница 10: ...39 8 44 Voc V 37 4 37 7 37 7 37 9 38 1 Isc A 8 69 8 76 8 83 8 87 8 93 Maximum Tolerance of Power 0 3 2 9 PM096B00 Series Module Dimensions L x W x H Module Dimensions L x W x H Module Dimensions L x...

Страница 11: ...AND OR PRODUCT WARR AND OR PRODUCT WARR AND OR PRODUCT WARRANTY ANTY ANTY ANTY 3 1 Mounting with Screws Secure the module to the structure using only the factory drilled mounting holes Do not drill an...

Страница 12: ...idistant from the closest module frame corner see Figure 1 Ensure the clamps are of sufficient design strength to allow for the maximum design pressure of the module Measurements of D1 D2 D3 and D4 be...

Страница 13: ...12 Figure Figure Figure Figure 2 2 2 2 Long rail mounting clamp zone D1 and D2 Figure Figure Figure Figure 3 3 3 3 Short rail mounting clamp zone D3 and D4...

Страница 14: ...298 mm 298 mm 11 73 in 11 73 in 11 73 in 11 73 in PM250M01 PM250M01 PM250M01 PM250M01 228 228 228 228 mm mm mm mm 8 98 8 98 8 98 8 98 in in in in 428 428 428 428 mm mm mm mm 16 85 16 85 16 85 16 85 in...

Страница 15: ...cation Details Module Clamp Location Details Module Clamp Location Details Module Clamp Location Details Long rail Long rail Long rail Long rail clamping for 5400 Pa design strength clamp between D1 D...

Страница 16: ...ing radius of r 4x static steady r 5x dynamic cable diameter must be maintained The cable must be routed in a way that tensile stress on the conductor or connection s is avoided Figure Figure Figure F...

Страница 17: ...f the nominal voltage BenQ Solar PV modules are supplied with or without cables according to where they are ordered If supplied without cables it is recommended that cables with cross sections between...

Страница 18: ...nd contact The grounding screw and bolt are usually sold separately from the mounting equipment Please make sure the grounding screw breaks the anodized surface of the module frame around the holes An...

Страница 19: ...ugh use of clamps that penetrate the anodization in conjunction with grounding of the mounting system or through direct grounding of the frames by attaching a copper wire to a grounding hole of each m...

Страница 20: ...odules guarantees their insulation up to a DC voltage of The IEC 61730 certificate of these modules guarantees their insulation up to a DC voltage of The IEC 61730 certificate of these modules guarant...

Страница 21: ...odule configurations for 1000V inverter Maximum series 1000V Product Voc 1 25 safety factor Example The Voc of PM200M00_200 is 30 4V then the maximum series parallel module configurations for 1000V in...

Страница 22: ...roppings collecting on the module surface Thin layers of dust normal soiling that reduce the sun s intensity evenly are not dangerous and the power reduction is not as significant as other debris Clea...

Страница 23: ...anodic oxide coatings is generally every six months When cleaning be sure not to damage or scratch this coating Dirt on the frame can generally be cleaned off using warm mildly soapy water and a fiber...

Страница 24: ...duct meets or exceeds the requirements set forth by UL1703 for PV Modules This UL1703 Standard covers flat plate PV modules intended for installation on buildings and those intended to be freestanding...

Отзывы: