Bennett Marine SST System Скачать руководство пользователя страница 3

Step 6

 

Install Hydraulic Power Unit (HPU) in a convenient location with 
a dry environment. 

Important: The HPU must be mounted 

in a dry enough location to avoid submersion and 

drenching. 

Allow space above the HPU so that it may be slid 

into its mounting bracket (about 3"). Lay out upper holes on 
HPU mounting bracket 4 5/8" apart and start #10 x 1" screws 
using 5/32" pilot holes. Then drill 5/32" pilot holes for lower 
screws and mounting bracket. Slide HPU into bracket.

Step 7

  

Inside the transom, apply Teflon tape on male threads of pipe 
nipples and tighten 90 degree brass elbows to pipe nipples. 

While tightening elbow, hold pipe nipple with vise grips 

to prevent stripping. 

Step 8 

 

Run hydraulic tubing from actuators at transom to HPU  

(See Figure 4) 

and cut to length. 

Note: Make port and  

starboard lengths as equal as possible. 

Step 9

 

Insert tubing through the nut with ferrule at 90 degree elbow. Push until it bottoms in 
the fitting. While continuing to bottom the tubing in the fitting, tighten nut “finger 
tight”, then one full turn with a 1/2" wrench . . . NO MORE.

Step 10

 

To connect tubing to Hydraulic Power Units, insert tubing through the nut with  
ferrule fitting and push into the pump-face fitting until it bottoms. While continuing  
to bottom the tubing in the fitting, tighten nut “finger tight”, then one full turn with a  
1/2" wrench … no more. Use tube bending clips at desired 90 degree bends in tubing to prevent kinking. 

Step 11

 

Connect HPU ground wire to the the vessel’s negative ground system.

Step 12

 

Wire control and electrical system per separate instruction sheet.

Step 13

 

Remove plug from filler stack located at the front left corner of the reservoir. Fill reservoir to “Full Line” using any type  

automatic transmission fluid (ATF)

Step 14

 

Using the control, hold the “Bow Down” position for 15 seconds, then “Bow Up” for 15-20 seconds. Repeat 3 times.  
This will purge air from the system. 

Step 15

 

Place both tabs in the “full down” position and check all hydraulic connections for leaks. Bring the tabs to the full up position  
and check fluid level. Add ATF if necessary

.

Figure 4

 

Tighten Nut with 1/2" Wrench One Full Turn Past Finger 
Tight - NO MORE

Push Tubing to Bottom of Fitting While Tightening

Отзывы: