17
17
4. Route the Cable through the Top Trough Safety Cable
Pulley(s) and across the lift. (See Figs 9.5 & 9.6)
5. Route the Cable the same way on the Powerside
going back down the Column.
6. Route the Cable over the top pin on the Safety Handle.
Insert the Cable end through the hole on the Threaded
Post. (See Fig 9.7)
7. Pull the slack out the Safety Cable and hold tension
as the Cable is being tightened. Tighten jam nuts on
either side of the Cable to secure it into place.
(See Fig 9.7)
StEP 10
(Installing Hydraulic Lines)
1. Install the Bulkhead Tee Fitting into the Powerside
Column. The through hole is located approximately 90
inches from the floor on the back wall of the Powerside
Column.
2. Connect the
Powerside
Cylinder Hose to the tee fitting
Be sure to route the hose through the retainer rings inside
the columns.
3. Route the
offside
Cylinder Hose (Crossover Hose) up
through the Column and across the Top Trough, down the
Column and connect it to the Bulkhead Tee Fitting.
(See Fig 10.1)
NotE:
M
ake sure to tighten both nuts equally so as to
keep the Safety Cable centered
Fig 9.6
Fig 9.7
Fig 10.1
Fig 9.5
Содержание XpR-10AC
Страница 23: ...23 23 ...
Страница 26: ...26 ...
Страница 30: ...30 30 OPTIONAL EQUIPMENT INSTALLATION ...
Страница 40: ...40 40 ...
Страница 41: ...41 41 ...
Страница 49: ...49 49 ...