LR-10000 Low-Rise Scissor Lift
10
P/N 5900075 — Rev. A1 — April 2019
Installation Checklist
Following are the steps needed to install your LR-10000 Lift. Perform them in the order shown.
☐
1. Review the installation Safety Rules.
☐
2. Plan for Electrical Work.
☐
3. Make sure you have the necessary Tools.
☐
4. Select the Installation Site.
☐
5. Make sure there is adequate Clearance on all sides of the Lift.
☐
6. Create Chalk Line Guides.
☐
7. Anchor the Bases.
☐
8. Install the Safety Lock Release Handle.
☐
9. Set up the Power Unit Stand.
☐
10. Attach the Power Unit.
☐
11. Connect the Hydraulic Lines.
☐
12. Prepare the Power Unit.
☐
13. Install a Power Disconnect Switch.
☐
14. Install a Thermal Disconnect Switch.
☐
15. Test the Lift.
☐
16. Review the Final Checklist.
☐
17. Leave the Manual for the owner/operator.
Содержание LR-10000
Страница 8: ...LR 10000 Low Rise Scissor Lift 8 P N 5900075 Rev A1 April 2019 Specifications ...
Страница 37: ...LR 10000 Low Rise Scissor Lift 37 P N 5900075 Rev A1 April 2019 Labels ...
Страница 38: ...LR 10000 Low Rise Scissor Lift 38 P N 5900075 Rev A1 April 2019 ...
Страница 39: ...LR 10000 Low Rise Scissor Lift 39 P N 5900075 Rev A1 April 2019 Parts Diagrams ...
Страница 40: ...LR 10000 Low Rise Scissor Lift 40 P N 5900075 Rev A1 April 2019 ...
Страница 41: ...LR 10000 Low Rise Scissor Lift 41 P N 5900075 Rev A1 April 2019 ...
Страница 43: ...LR 10000 Low Rise Scissor Lift 43 P N 5900075 Rev A1 April 2019 Maintenance Log ...
Страница 44: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2019 by BendPak Inc All rights reserved bendpak com ...