STEP 3
( Column & Cross Tube Installation )
1. Place a chalk line on the floor according to the floorplan
layout. Pay attention to the power unit location. Locate and
stand the columns at their respective locations.
DO NOT
BOLT
columns down at this time. Use caution to prevent the
columns from falling over. (See Fig. 3.1)
2. To estimate the shim requirements, place a target on floor
at each column position and record the readings. Find the
highest of the four locations then find the difference between
each of the remaining columns. This difference is the
estimated amount of shim thickness that will be required at
each column. (See Fig. 3.2 )
Note: The maximum shim thickness recommended by the
factory is no more than 1/2" per column using shims and
anchors provided with the lift. A maximum shim thickness of
2" is possible by ordering optional shim plates. Contact your
authorized BendPak Distributor for ordering information.
3. Using a forklift or crane, raise the cross tubes (making sure
the plastic slide blocks are still in position) and drop down into
the top of the columns. NOTE: The sheave windows should
be positioned inward and adjacent the power unit column.
(See Fig. 3.3 )
4. With the columns standing and the cross tubes in
position, install the safety ladders. Pass the ladders
through the column openings and drop down through the
slide block guide slots on the cross tube until the ladders
come to rest on the base plates.
DO NOT BOLT
columns
down at this time. (See Fig. 3.4 & 3.5 )
11
Fig. 3.1
Fig. 3.2
Fig. 3.3
Fig. 3.4
Fig. 3.5
Содержание HD-12-B
Страница 14: ...14 ...
Страница 19: ...19 ...
Страница 25: ...OPTIONAL EQUIPMENT INSTALLATION 25 ...
Страница 26: ...26 OPTIONAL EQUIPMENT INSTALLATION ...
Страница 29: ...29 ...
Страница 30: ...30 ...
Страница 37: ...37 Main Parts List ...
Страница 38: ...38 Runway Parts List ...
Страница 39: ...39 Crosstube Parts List ...
Страница 42: ...42 ...
Страница 43: ...43 OPTIONAL EQUIPMENT ...