BENDIXKing AeroPower Скачать руководство пользователя страница 11

 600840-000055 AeroPower USB Charging Port Installation Instructions 

Rev. 1.0 

Last Revised: January 7, 2019 

 

Page 11 of 13 

4.  Connect aircraft power and ensure that the breaker is pushed in. 

5.  Verify the voltage output of AeroPower before connecting any devices. 

4. Troubleshooting 

Problem 

Troubleshooting Steps 

AeroPower is not powering a 
device. 

  Verify that the circuit protective device is functioning 

correctly. 

  Verify that the polarity on the power connector is 

correct. 

 

Technical Assistance 

For support, please contact BendixKing at 

[email protected]

 

 
 

 

Содержание AeroPower

Страница 1: ...AeroPower USB Charging Port Installation Instructions Document Number 600840 000055 Last Revised 7 January 2019 Rev 1 0 Sheet 1 of 13 AeroPower USB Charging Port Installation Instructions For...

Страница 2: ...USB Charging Port Honeywell International Inc 9201 B San Mateo Blvd NE Albuquerque NM 87113 USA Visit us on the web at www bendixking com Questions E mail us at techsupport bendixking com AeroPower d...

Страница 3: ...s 7 1 9 Limitations for installation 7 1 10 Circuit protective device marking 7 2 Mounting AeroPower USB Charging Port 8 3 Wiring AeroPower USB Charging Port 9 4 Troubleshooting 11 Technical Assistanc...

Страница 4: ...AeroPower USB Charging Port Installation Instructions Rev 1 0 Last Revised January 7 2019 Page 4 of 13 Record of Revision Revision Number Change Description Revision Date Inserted By 1 0 Initial Relea...

Страница 5: ...er USB Charging Port Maintenance Manual FAA AC 43 13 1B Acceptable Methods Techniques and Practices Aircraft Inspection and Repair FAA AC 43 13 2B Acceptable Methods Techniques and Practices Aircraft...

Страница 6: ...O C71 Subpart B Environmental qualification testing was performed to DO 160G not DO 60 Table 2 TSO deviations 1 4 Environmental qualifications AeroPower is tested to DO 160G The AeroPower Environmenta...

Страница 7: ...Quantity AeroPower Assembly 89000031 001 1 AeroPower Panel Cover 1 Screw 2 Power Connector Receptacle 1 Connector Terminals 2 Table 5 Supplied hardware 1 8 Unpacking inspection requirements When unpac...

Страница 8: ...provide adequate clearance in the front and back of the unit based on the dimensions given in Table 3 ATTENTION Process may result in metal shavings Ensure that they do not fall behind the aircraft pa...

Страница 9: ...must supply 20 24 gauge wiring and install it in accordance with FAA AC 43 13 1B and AC 43 13 2B Wire length and routing will vary by installation The installer must also supply a circuit protective d...

Страница 10: ...wer and ensure that the breaker is pushed in b On the power harness place the negative probe of a multimeter on Pin 2 and the positive probe on Pin 1 c Measure the voltage across the two wires using a...

Страница 11: ...shed in 5 Verify the voltage output of AeroPower before connecting any devices 4 Troubleshooting Problem Troubleshooting Steps AeroPower is not powering a device Verify that the circuit protective dev...

Страница 12: ...Operating High Temperature 4 5 3 Equipment tested to Category F1 Operating High Temperature 4 5 4 Equipment tested to Category F1 In Flight Loss of Cooling 4 5 5 Equipment identified as Category X no...

Страница 13: ...tested to Category BXX Voltage average value dc 16 6 1 1 Equipment tested to Category BXX Abnormal Operating Conditions dc 16 6 2 Equipment tested to Category BXX Voltage Spike 17 0 Equipment tested...

Отзывы: