BW1786 © 2004 Bendix Commercial Vehicle Systems LLC All rights reserved. 3/2004 Printed in U.S.A.
Страница 1: ...al applications the valve is available with zero hysteresis Port Embossed I D Supply SUP 1 Delivery DEL 2 Exhaust EXH3 FRONT AXLE BRAKE CHAMBER FIGURE 3 PARTIAL SYSTEM SCHEMATIC WITH QRN 2 QUICK RELEA...
Страница 2: ...t the air pressure on the delivery side of the diaphragm holds the outer edge of the diaphragm against the sealing lip in the body while simultaneously moving the center portion away from the exhaust...
Страница 3: ...lve should be inspected every 12 months or 3600 operating hours whichever comes first for proper operation Should the QRN 2 valve not meet the elements of the operational tests noted in this document...
Страница 4: ...BW1786 2004 Bendix Commercial Vehicle Systems LLC All rights reserved 3 2004 Printed in U S A...