Testing and measuring
34
Connect the DUT to the test system.
1.
To connect hospital beds, care beds and electrical equipment using a plug-in connector:
2.
Connecting single-phase permanently installed equipment to the test system
– Switch off the power to the device
– Disconnect the power supply connection.
E
L
N
PE
Device
under test
Содержание UNIMET 300ST
Страница 50: ...Testing and measuring 50 TGH1365en 10 2012...
Страница 58: ...Data 58 TGH1365en 10 2012...
Страница 61: ......