background image

iso1685P_D00003_01_M_XXEN / 12.2016

21

Commissioning

6. Commissioning

6.1 Commissioning flow chart insulation fault monitoring

System = IT system ?

Device connection

Un < AC1000 / DC1500 V ?

iso1685P not suitable

no

Deenergize the installation before

connecting the device

E and KE to PE

System to L1/+, L2/-

Optional Device connection

BMS bus to A, B, S

Supply voltage to A1/A2

Message periphery to K1, K2, K3 

11-12-14, 21-22-24, 31-32-34

Connect supply voltage

Connect system voltage

no

yes

yes

yes

iso1685P not suitable

Check connection 

or device error

Shall the factory setting 

be retained?

no

yes

Carry out settings via the 

BMS bus

Alarm LEDs activated?

no

yes

Preset response value

undershot, possibly adjust

Function test with a suitable

resistance between system and 

earth. Value: 50% of the response 

value Ran2

Alarm LEDs activated?

Alarm relays switched?

yes

no

Check connections

Remove resistance

The iso1685P is correctly 

connected and functions reliably

Alarm LEDs extinguished?

Alarm relays switched?

no

The iso1685P successfully 

carries out a self test

yes

no

6.2 Commissioning flow chart insulation fault location

Install the Insulation fault 

locator EDS46x /49x and the 

appropriate CTs

Connect the RS-485 interface 

(BMS bus) of the EDS46x /49x 

to the iso1685P

Address all BMS 

components, a bus master 

with address 1 is required

Connect supply voltage

Connect system voltage

iso1685P successfully

carries out a self test

Function test with a suitable

resistance between system and 

earth. Value: 50% of the response 

value Ran2

Alarm LEDs activated?

Alarm relays switched?

yes

no

Set the EDS mode of the iso1685P 

to „auto“ via the BMS bus 

Press the test button of the

EDS

46x / 49x

Is the faulty subcircuit being 

recognised correctly:

ADR:xx   k:xx    xxmA

yes

Shall other connected

CTs be tested?

Are all CTs recognised correctly 

from EDS46x / 49x ?

no

Check the CT wiring

yes

no

yes

Remove resistor and select another circuit 

downstream a measuring current 

transformer

LED "PGH on" of the iso1685P

is flashing. Insulation fault 

location is activated

Shall the factory setting be 

retained?

yes

no

Change the settings in the EDS device menu, 

change the EDS parameters of the iso1685P

yes

no

Connection or device error: 

check connections

yes

Remove the resistor

Alarm LEDs extinguished?

Alarm relays switched?

Delete alarm messages:

Press reset button at the EDS46x 

/49x or call up the EDS reset in 

the EDS46x /49x menu

no

no

The EDS... operates properly 

and is connected correctly

Make sure that the system is 

disconnected from any electrical 

source before connecting the device!

Содержание iso1685 Series

Страница 1: ...Manual EN ISOMETER iso1685 Insulation monitoring device for unearthed AC AC DC and DC power supplies IT systems up to AC 1000 V DC 1500 V Software version D408 v1 0x iso1685P_D00003_01_M_XXEN 12 2016...

Страница 2: ...259 E Mail info bender de Web www bender de Customer service Service Hotline 0700 BenderHelp Telephone and Fax Carl Benz Stra e 8 35305 Gruenberg Germany Tel 49 6401 807 760 Fax 49 6401 807 629 E Mai...

Страница 3: ...value transmission to the control inputs of the inverter 11 3 3 6 History memory 11 3 4 Self test 11 3 4 1 Self test after connection to the supply voltage 11 3 4 2 Automatic self test 11 3 4 3 Manual...

Страница 4: ...8 Device communication via the BMS bus 26 8 1 RS 485 interface with BMS protocol 26 8 2 Topology RS 485 network 27 8 3 BMS protocol 27 8 4 Commissioning of an RS 485 network with BMS protocol 28 8 5 S...

Страница 5: ...in making optimum use of the product DANGER WARNING CAUTION 1 2 Technical support For commissioning and troubleshooting Bender offers you 1 2 1 First level support Technical support by phone or e mai...

Страница 6: ...cal industry set out by the ZVEI Zentralverband Elektrotechnik und Elektronikindustrie e V German Electrical and Electronic Manufacturer s Association also applies Sale and delivery conditions can be...

Страница 7: ...oubt please contact our service department DANGER DANGER Make sure that the basic settings meet the requirements of the IT system Children and unauthorised persons must not have access to or contact w...

Страница 8: ...ing on the ap plication and the selected measurement method continuous insulation monitoring is also possible in this frequency range There is no influence on the insulation monitoring for IT systems...

Страница 9: ...stem and earth falls below the set prewarning response value Ran1 the LED Alarm 1 lights and the alarm relay K1 swit ches When the values fall below the alarm response value Ran2 also LED Alarm 2 ligh...

Страница 10: ...th which EDS insulation fault locators can locate insulation faults iso1685P utilises an internal locating current injector with IL 50 mA DC Abb 3 2 Pulse sequence of the internal locating current inj...

Страница 11: ...able By way of example history memory entries are shown on page 33 3 4 Self test 3 4 1 Self test after connection to the supply voltage Once connected to the supply voltage all internal measurement fu...

Страница 12: ...2016 12 4 Display and operating controls 4 1 Dimensions SERVICE ALARM 2 ISOMETER iso1685 ON ALARM 1 PGH ON 246 mm 125 mm 40 5 mm 40 75 mm 51 mm 368 mm 383 mm 401 5 mm 106 mm 64 mm 8 75 mm 5 2 mm 61 8...

Страница 13: ...on A B S Connection to BMS bus RS 485 Protokoll BMS S shield connect one end to PE k I kT IT no function 31 32 34 Alarm relay K3 for internal device error LED Service 21 22 24 Alarm relay K2 for insul...

Страница 14: ...D00003_01_M_XXEN 12 2016 14 ISOMETER iso1685 PGHON LED s ON Power on PGH ON Insulation fault location SERVICE device error connection fault ALARM 1 Insulation fault ALARM 2 Insulation fault DIP switch...

Страница 15: ...th and system L1 L2 6 ALARM 2 yellow Insulation fault 2 alarm The ALARM 2 LED lights continuously when the insulation resistance falls below the response value 2 RF Ran2 Flashes Connection fault check...

Страница 16: ...rations Touch the enclosure and the terminals with due care Risk of property damage due to unprofessional installation If more than one insulation monitoring device is connected to a conduc tively con...

Страница 17: ...arelocked Tounplugtheterminals the orange sliders must be slid towards the front towards the device to unlock the terminal Now the terminal can be unplugged 5 2 3 Connecting the EDS to the ISOMETER R...

Страница 18: ...685P_D00003_01_M_XXEN 12 2016 18 5 3 Connection to an AC system ISOMETER iso1685 L1 L2 US 6A 313234 111214 212224 6A PE 1A 1A to COM465 or CP700 for parameter setting 2 PE k I kT IT I2 I2 I1 I1 A1 A2...

Страница 19: ...DS440 I L 7 6 5 3 8 4 2 0 1 6 5 3 4 2 0 1 9 8 EDS440 ISOSCAN TEST MUTE RESET ALARM ALARM ON COM SERVICE CHANNELS SLAVE ADDRESS 12 11 10 9 8 7 1 2 3 4 5 6 9 7 l l A1 A2 I L I n I L I n to the loads to...

Страница 20: ...n AC system BMS Bus EDS46 D to COM465 or CP700 for parameter setting to the loads to the loads L1 L2 PE US Un 6A ISOMETER iso1685 US 6A 6A 1A 1A k I kT IT I2 I2 I1 I1 A1 A2 E KE L2 L1 A B S 313234 111...

Страница 21: ...iate CTs Connect the RS 485 interface BMS bus of the EDS46x 49x to the iso1685P Address all BMS components a bus master with address 1 is required Connect supply voltage Connect system voltage iso1685...

Страница 22: ...permissible system leakage capacitance or measurement speed Segments 6 and 7 of the DIP switch SS8103 are used to select the maximum system leaka ge capacitance Ce max and to set the measurement spee...

Страница 23: ...ystem is NOT being monitored The device uncouples itself from the system to be moni tored through an internal system isolating switch Reset Reset of fault and alarm messages 7 4 3 Mode of the digital...

Страница 24: ...Set the maximum locating current for the insulation fault location from 1 50 mA You can set this paramenter via a BMS gateway e g COM460IP or a terminal tool and the BMS bus 7 6 2 Mode To locate insul...

Страница 25: ...each system Inactive insulation fault location insulation measurement Active insulation fault location for 1 cycle Insulation fault location pauses insulation measurement Active insulation fault locat...

Страница 26: ...purpose the device is equipped with the terminating switch RS 485 Term ON OFF An RS 485 network that is not terminated is likely to become unstable and may result in malfunctions Only the first and la...

Страница 27: ...are Baud rate 9600 baud Transmission 1 start bit 7 data bits 1 parity bit 1 stop bit 1 7 E 1 Parity even Checksum sum of all transmitted bytes 0 without CR and LF The BMS bus protocol works according...

Страница 28: ...e BMS bus Messages are transmitted to a maximum of 12 BMS channels All alarm and operating messages which may occur are described below 8 7 1 Alarm messages 8 7 2 Operating messages Alarm Channel Mean...

Страница 29: ...re Supply voltage 12 V Replace device 8 45 Hardware Supply voltage 5 V Replace device 8 46 Hardware Supply voltage 3 3 V Replace device 9 61 Parameters Insulation measurement Load factory settings and...

Страница 30: ...iso1685P_D00003_01_M_XXEN 12 2016 30 9 Diagrams 9 1 The measurable leakage capacitance depends on the insulation resistance 1 10 100 1000 0 0 5 0 5 5 5 0 Capacitance F Fault resistance k...

Страница 31: ...Diagrams iso1685P_D00003_01_M_XXEN 12 2016 31 9 1 1 Response time for insulation measurement 1 10 100 0 2 2 5 5 0 10 0 25 0 50 0 75 0 0 F 2 F 10 F 100 F 500 F R k an s iso1685P p o le 500 F F...

Страница 32: ...Diagrams iso1685P_D00003_01_M_XXEN 12 2016 32 1 10 100 0 2 2 5 5 0 10 0 25 0 50 0 100 0 250 0 500 0 0 F 2 F 10 F 100 F I R k an s iso1685P p o le 150 F F...

Страница 33: ...rtTime AcknowledgeTime EndTime Index of the history memory ID of the entry Min and Max value during the alarm Unit Type of theentry Message Message due to the test Start me Acknowledge me End me of th...

Страница 34: ...n2 Upper limit of the measuring range when set to Cemax 500 F 200 k Relative uncertainty 10 k 1 M acc to IEC 61557 8 15 Relative uncertainty 0 2 k 10 k 200 15 Hysteresis 25 Time response Response time...

Страница 35: ...IEC 60721 3 3 3M4 Stationary use for iso1685PW IEC 60721 3 3 3M7 Transport IEC 60721 3 2 2M2 Long term storage IEC 60721 3 1 1M3 Deviation from the classification of climatic conditions Ambient temper...

Страница 36: ...61557 8 VDE 0413 8 IEC 61557 8 DIN EN 61557 9 VDE 0413 9 IEC 61557 9 IEC 61326 2 4 DIN EN 60664 1 VDE 0110 1 10 4 Ordering data The data labelled with an are absolute values Type Response value range...

Страница 37: ...iagram 16 DIP Schalter 15 Display and operating controls 12 E Error codes 22 F Factory settings 21 H Hazards when handling the device 7 History memory 11 I Installation of the device 16 Insulation fau...

Страница 38: ...le system leakage capacitance 28 Set system leakage capacitance 35 Setting addresses 8 Setting the maximum system leakage capacitance 22 Settings Inputs 23 Profile 25 Speicherkarte 15 Standards 36 Sta...

Страница 39: ...z Stra e 8 35305 Gruenberg Germany Tel 49 6401 807 760 Fax 49 6401 807 629 Email info bender service com Web http www bender de BENDER Group Bender GmbH Co KG P O Box 1161 35301 Gruenberg Germany Lond...

Отзывы: