background image

Page 40

APPENDIX E

3OLAR0OD HAS BEEN DESIGNED TO SIMPLY TRANSFER HEAT FROM A SOLAR HEATING PANEL SYSTEM
INTOATHERMALSTORE"ECAUSESOLARSYSTEMSCANBEINDIRECTORDIRECTTHEREARETWOMODELS
OF 3OLAR0OD TO SUIT  #ARE SHOULD BE TAKEN TO ENSURE THAN AN INDIRECT SYSTEM IS NOT BEING
WRONGLYCONNECTEDTOADIRECTSYSTEMORVISAVERSA4HEMOSTCOMMONTYPEOFSOLARSYSTEM
WILLBEINDIRECTANDALABELONTHE3OLAR0ODWILLINDICATETHETYPEOFPODSUPPLIED

3OLAR0ODSHAVEBEENPRODUCEDTOCONNECTSPECIlCALLYTO'LEDHILLTHERMALSTORESWHICHNEED
TOBEORDEREDASSPECIALSFOR3OLAR0ODCONNECTION4HETHERMALSTOREISTHENSUPPLIEDWITH
TWOEXTRAMMPIPECONNECTIONSTOCONNECTDIRECTLYTOTHE3OLAR0ODANDISSUPPLIEDWITHA
MMSENSORPOCKET

RDDOWNFROMTHETOPTOBEUSEDBYTHESOLARPANELSYSTEMCONTROLS

3OLAR0ODSMUSTBEPOSITIONEDIMMEDIATELYUNDERTHETHERMALSTORESOTHATTHEHEATTRANSFER
MAYOPERATEUNDERGRAVITYCIRCULATION)FTHISISNOTPOSSIBLETHENAPUMPCANBEUSEDBUT
SPECIALIST ADVICE SHOULD BE SOUGHT FROM OUR TECHNICAL DEPARTMENT ON HOW TO CONTROL THE
mOWANDRETURN@ONAND@OFFPERIODS

#ONSIDERATION MUST BE GIVEN TO THE TOTAL HEIGHT OF THE 3OLAR0OD WITH THE THERMAL STORE

POSITIONEDONTOP

 &OR INDIRECT 3OLAR0OD THE FEED CISTERN CAN
BE SITED ON TOP OF THE APPLIANCE WITHIN A
MINIMUMCUPBOARDSIZEOFMM4HISSTILL
ALLOWSTHEMINIMUMSERVICEHEIGHTOFMM
ABOVE THE CISTERN TO SERVICE A BALLVALVE
IF NECESSARY  #HECK THE CEILING HEIGHT IS
SUFlCIENTFORALLLARGER3OLAR0ODTHERMALSTORE
COMBINATIONSORARRANGETORELOCATETHEFEED
CISTERNATAHIGHERLEVEL

).$)2%#43/,!2/$

4HE INDIRECT 3OLAR0OD HAS  X MM PIPE
STUBCONNECTIONSA³v"30DRAINANDAMM
SENSORPOCKETTHATCANBEUSEDFORCONTROLLING
THEHEATINPUTAVAILABLEFROMTHESOLARPANEL
CONTROLS

(AVING FAMILIARISED YOURSELF WITH THE
CONNECTIONS THE INDIRECT VERSION HAS A K7
HIGH EFlCIENCY RATED COIL HEAT EXCHANGER
SUITABLE FOR CONNECTING TO SEALED SOLAR
HEATING PANEL SYSTEMS  4HESE ARE MARKED
SOLARPRIMARYmOWANDSOLARPRIMARYRETURN

4HEOTHERTWOMMPIPECONNECTIONSONTHE
3OLAR0OD ARE TO LINK THE 3OLAR0OD WITH YOUR
CHOICE OF THERMAL STORE  4HESE ARE MARKED
STORE PRIMARY mOW AND STORE PRIMARY RETURN
ANDMUSTBECONNECTEDTOTHESAMEMARKED
PIPECONNECTIONSONTHETHERMALSTORE

P P

4HE

THERMAL STORE IS THEN lLLED VIA ITS OWN FEED
CISTERNANDTHISINTURNlLLSTHE3OLAR0OD/N
INDIRECT VERSIONS THE SOLAR PANELS AND THE
3OLAR0OD COIL ARE lLLED VIA ANOTHER SOURCE
DEPENDINGONTHETYPEOFSOLARSYSTEM

3/,!20/$).34!,,!4)/.).3425#4)/.3

$)2%#43/,!20/$

30$)2 

).$)2%#43/,!20/$

30).$ 

L

E

D

O

-

E

C

N

A

I

L

P

P

!

E

R

O

T

3

L

A

M

R

E

H

4

T

H

G

I

E

(

L

A

T

O

4

G

N

I

D

U

L

C

X

E

N

R

E

T

S

I

#

%

&

T

H

G

I

E

(

L

A

T

O

4

G

N

I

D

U

L

C

N

I

N

R

E

T

S

I

#

%

&

-

"

E

T

A

-

R

E

LI

O

"

-

3

E

T

A

-

E

T

S

Y

3

-

"

E

T

A

-

R

E

LI

O

"

-

3

E

T

A

-

E

T

S

Y

3

-

"

E

T

A

-

R

E

LI

O

"

-

3

E

T

A

-

E

T

S

Y

3

-

"

E

T

A

-

R

E

LI

O

"

-

3

E

T

A

-

E

T

S

Y

3

-

"

E

T

A

-

R

E

LI

O

"

-

3

E

T

A

-

E

T

S

Y

3

L

E

D

O

-

D

O

0

R

A

L

O

3

$

.

)

0

3

2

)

$

0

3

 

S

E

R

T

IL

E

M

U

L

O

V

E

G

A

R

O

T

S

L

A

N

I

M

O

.

 

M

M

N

O

I

S

N

E

M

I

D

LL

A

R

E

V

/

T

H

G

I

E

(

H

T

D

I

7

H

T

P

E

$

 

G

K

T

H

G

I

E

7

Y

T

P

M

%

LL

U

&

$

4

-

,

#

Ž

T

A

 

7

K

G

N

I

T

A

R

R

E

G

N

A

H

C

X

E

T

A

E

(

S

L

T

A

 

'

7

M

P

O

R

D

E

R

U

S

S

E

R

P

R

E

G

N

A

H

C

X

E

T

A

E

(

 

=

R

A

B

;

'

7

M

E

R

U

S

S

E

R

P

G

N

I

K

R

O

W

M

U

M

I

X

A

-

R

E

G

N

A

H

C

X

E

T

A

E

(

=

;

E

R

O

T

S

Y

R

A

M

I

R

0

=

;

=

;

Содержание SysteMate 125 97-317-26

Страница 1: ...H THE WATER HEATER MANUFACTURERS SPECIFICATION FOR HOT WATER ONLY THERMAL STORES SYSTEMATE 2000 SYSTEMATE 2000 TM benchmark Thecodeofpracticefortheinstallation commissioning servicingofcentralheatings...

Страница 2: ...System audited by BSI Patents Pending TheGledhillGroup sfirstpriorityistogivea high quality service to our customers Quality is built into every Gledhill product and we hope you get satisfactory serv...

Страница 3: ...m The SysteMate 2000 is not covered by section G3 of the current Building Regulations and is therefore not notifiable to Building Control The information in this manual is provided to assist generally...

Страница 4: ...hmark Guidance Note for Water Treatment in heating and hot water systemstheinstallershouldcheckthehardness levels of the water supply and if necessary fit an in line scale inhibitor reducer to provide...

Страница 5: ...1 W k 0 2 W k 5 2 W k 0 3 W k 5 3 W h c t i w S W k 9 W k 9 W k 9 W k 9 W k 9 s e p y t g n i l l e w D l a c i p y T s m o o r d e B 3 1 3 2 4 2 5 3 6 4 s m o o r h t a B 1 1 2 1 2 2 3 4 r e w o h s...

Страница 6: ...ld feed open vent pipework assembly is supplied separately Optional Extra Equipment A soft water model is available for areas where the hardness level is below 200 p p m mg ltr Flexible connection kit...

Страница 7: ...idered adequate access if the ballvalve is not being fitted i e manual fill is being used 280mm 25 litre Expansion Vessel Supplied with SM 210 225 plan B 350mm S N O I S N E M I D E C N A I L P P A l...

Страница 8: ...n be used and we do offer a set of flexible connectors as an option for use with suitable push fit connectors only All pipe positions are approximate and subject to a tolerance of 10mm in any directio...

Страница 9: ...Page 9 SYSTEMATE 2000 1 2 TECHNICAL DATA PERFORMANCE GRAPHS OF GRUNDFOS PUMPS 1 0 DESIGN GRUNDFOS 15 50 GRUNDFOS 15 60 litres sec 6 litres sec Note 1mW G 10kPa...

Страница 10: ...See Appendix C for a copy of the relevant part of the Benchmark Guidance Note 1 0 DESIGN 0RESSURE LIMITING VALVE 4 2 15 2 AT PRESSURES BELOW BAR UNLESS ANY COMPONENTS HAVE A LOWER MAXIMUM WORKING PRES...

Страница 11: ...manufacturer and is installed fully in accordance with their recommendations This is particularly important in relation to use of push fit connections when using the optional flexible hose kits see 2...

Страница 12: ...that a check valve or valves are fitted on the vertical flow pipes 1 3 SYSTEM DETAILS Forexample At24litres minprimaryflowrate the pressure loss through the SysteMate 2000 model SM210 coil and fittin...

Страница 13: ...rd copper pipework and fittings However we are happy that plastic pipework systems can be used in place of copper internally as long as the chosen system is recommended for use on domestic heating sys...

Страница 14: ...0 DESIGN 1 3 SYSTEM DETAILS Boiler sited above the SysteMate or with dipped flow and return pipes A gravity check valve should be fitted in the boiler return pipework to prevent gravity circulation be...

Страница 15: ...f the main system is working correctly If Switch is ordered the electrical supply will need to take account of the increased load Full details of the requirements are provided in Section 2 1 Site Requ...

Страница 16: ...d to take this into account Noventilation isnormallyrequiredtothecupboard A suitable location will be needed for the separate feed and expansion cistern and expansion vessel This will often be at high...

Страница 17: ...posite Before installation the site requirements should be checked and confirmed as acceptable The plastic cover and protective wrapping should be removed from the appliance and the installation base...

Страница 18: ...er as similar assurances cannot be obtained for Polypipe fittings we cannot recommend their use Connections A B D E F G H I and L are plain ended copper pipe Connections C J are compression fittings C...

Страница 19: ...the feed and expansion cistern should be installed following the instructions provided by the manufacturer in a position to suit the particular location and the cistern fitted on its supports base Th...

Страница 20: ...9 2 2 2 OILER PUMP 9 9 9 9 2 2 2 2 2 2 3 3 LOCK 335 4 3 0 002 6 3YSTE ATE WITH CLOCK OTE SAME CONNECTIONS APPLY FOR STANDARD CLOCK ROST 0ROTECTION EON 3 4 2 2 PTIONAL XTRA IF FITTED WIRING DIAGRAM ST...

Страница 21: ...omplete the electrical installation provided they adhere strictly to the IEE Requirements for Electrical Installations BS 7671 A schematic arrangement of the wiring is shown on page 24 All the termina...

Страница 22: ...se temperature is required during cold weather then a frost thermostat should be wired across plug in terminals 21 and 23 on the A C B board An alternative to fitting a frost thermostat would be to se...

Страница 23: ...MMERSION 54 9 9 2 2 9 2 2 2 2 2 9 2 2 2 7 9 2 2 2 2 2 2 2 2 ROST 3TAT ONN ONTROL 4HERMOSTAT AINS IN VIA CABLE TAIL 2 7 2 2 2 7 335 4 3 04 002 6 3YSTE ATE WITH 37 4 AND CLOCK FITTED OPPER US AR 4ERMINA...

Страница 24: ...service slot provided in the base of appliance and connect to the isolator as follows red live black neutral green yellow earth Check the cables are secure in the grips provided below the terminal st...

Страница 25: ...e given in PAS 33 1999 under Section 10 Commissioning When using either cleansing or corrosion inhibitor chemical the manufacturers instructions must be followed Cleansing the Primary System It is ver...

Страница 26: ...mostat 3 Check the jumper settings are correct Thesemustallbeinthecorrectpositions for the appliance to work correctly see opposite for options 4 Switch on the mains supply The A C B will automaticall...

Страница 27: ...room thermostat Horizontal LED bar 1 HT will light Green LED 3 on the A C B will switch on Heating pump will run 3 Switch off space heating on clock programmer or room thermostat Horizontal LED bar 1...

Страница 28: ...s cold is correct and does not overflow when the appliance is at maximum temperature DO turn down the servicing valve for the ballvalve in the F E cistern once the system is finally filled to the poin...

Страница 29: ...using the Speed Spares service or through any of the larger plumbers merchants specialist heating spares suppliers Help and advice is also available from the Technical Helpline on 08449 310000 Howeve...

Страница 30: ...c n a i l p p A k o l E 5 5 2 B X 8 5 1 9 3 E 1 1 r o s n e s e r o t S k o l E 9 4 1 T G 2 2 0 6 2 E 2 1 r o s n e s n r u t e r E H P k o l E 3 5 1 T G 4 2 0 6 2 E 3 1 r o s n e s e r u t a r e p m...

Страница 31: ...Page 31 SYSTEMATE 2000 3 0 SERVICING 24 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 21 21 22 23 20 17 26 27 28...

Страница 32: ...d vent the pump if necessary Water hammer loose pipework and or tap washers 2 Causes of Unsatisfactory Hot Water Service Check that the SysteMate is full of water i e level of water in the appliance F...

Страница 33: ...ns on thelabelfittedtotheapplianceuntiltheinstaller manufacturer can attend Whenrequestingavisitfromthemanufacturer the installer must have the completed Benchmark commissioning service record sheet t...

Страница 34: ...ed 25 30 l m Regulated 10 12 l m SHOWERS WATER SAVINGS OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or extern...

Страница 35: ...ng holes 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 55mm 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 165mm 595mm A hot B cold blank blank 18 l...

Страница 36: ...d the resistance characteristics of the pipes The examples presented below are for 15mm copper pipe in table 1 and for plastic pipework in table 2 The preferred solution where space will allow An opti...

Страница 37: ...anched off the cold water main prior to the treatment device instead of the cold water manifold Any other isolating control valves and backflow protection devices should be provided as necessary to co...

Страница 38: ...d be fixed to the system in a prominent location Where a combi boiler and or a hot water storage vessel is installed in areas where the mains water can exceed 200ppm Total Hardness as defined by BS 75...

Страница 39: ...Page 39 SYSTEMATE 2000 APPENDIX D...

Страница 40: ...ATIONS OR ARRANGE TO RELOCATE THE FEED CISTERN AT A HIGHER LEVEL 2 4 3 2 4HE INDIRECT 3OLAR0OD HAS X MM PIPE STUB CONNECTIONS A v 30 DRAIN AND A MM SENSOR POCKET THAT CAN BE USED FOR CONTROLLING THE H...

Страница 41: ...TALLATION AND SERVICING INSTRUCTIONS WHICH MUST BE READ AND FULLY COMPLIED WITH DVICE MUST BE OBTAINED FROM LEDHILL TECHNICAL DEPARTMENT ON ANY DISCREPANCIES OR PROBLEMS ENCOUNTERED IN MEETING THESE R...

Страница 42: ...Page 42...

Страница 43: ...Page 43 SYSTEMATE 2000...

Страница 44: ......

Отзывы: