2
These instructions are suitable for the CALYDRA GREEN boilers :
Do not forget the Log Book
Chaffoteaux & Maury supports Benchmark, the heating industry code to ensure the correct installation, commissioning and
servicing of domestic central heating systems.
To The Householder
Make sure you have a completed Log Book for your boiler. This provides a record of the commissioning of your boiler.
It contains important information about your particular installation that may be required by service engineers. The Log Book will
also provide contact details for the installer should you need guidance in the use of this appliance or if there are any problems.
As with your car, your boiler will work more reliably and efficiently if regularly serviced. We recommend an annual service
check. The service history of the appliance will be recorded on the Log Book.
In the unlikely event of any problems with your boiler or system you should first contact your installer. If your installer cannot
resolve the problem he should telephone our national service helpline.
A charge may be made if Chaffoteaux & Maury Service is called out to resolve a non-product related fault.
Your statutory rights are not affected.
CUSTOMER CARE
Chaffoteaux & Maury Ltd., as a leading manufacturer of domestic and commercial water heating appliances is committed to
providing high quality products and a high quality after sales service. If it is necessary to contact an engineer, then telephone
the national warranty helpline 0870 600 9888.
Advice on installation or servicing can also be obtained by contacting the Technical Department.on:
Tel: 0870 241 8180
Fax: 01494 459775
GUARANTEE
The manufacturer’s guarantee is for 12 months from the date of purchase. The guarantee is invalidated if the appliance is not
installed in accordance with the recommendations made herein or in a manner not approved by the manufacturer. To assist us
in providing you with an efficient after sales service, please return the guarantee registration card enclosed with the boiler
without delay.
STATUTORY REQUIREMENTS
The installation of this appliance must be carried out by a CORGI Registered person or other competent person and in
accordance with the requirements of the Gas Safety (Installation and Use) Regulations.
In addition, the installation must also comply with the current bylaws of Local Water Undertakings, Building Regulations, IEE
Wiring Regulations, Local Authority Building Standards (Scotland) Regulations and the Safety Document 635 The Electricity at
work Regulation. The appliance named below does not contain any asbestos or asbestos products, or mercury
derivatives. Additional CFC’s have not been used in this product.
The appliance does not contain any potential hazard in relation to the COSHH regulations.
It should also be carried out in accordance with current editions of the following British Standards Codes of practice: BS 6891,
BS 5440 parts 1 and 2, BS 5449 part 1, BS 7593, BS 6798, BS 5546, BS 4814, BS 7074 part 1 and 2, BS 7671 and BG DM2.
If there is a possibility of the incoming mains water pressure exceeding 10 bar then a suitable pressure limiting valve must be
fitted where pressures exceed 6 bars a pressure limiting is preferred.
Precautions: During servicing, keep the dust generation to a minimum and avoid inhaling any dust and contact with the skin
and eyes. Normal handling and use will not present any discomfort, although some people with a history of skin complaints
may be susceptible to irritation. When disposing of the ceramic lining, ensure that it is securely wrapped and wash hands after
contact.
TO CONTACT C&M SERVICE, PLEASE CALL THE NATIONAL WARRANTY HELPLINE ON:
0 870 600 9888
To The Installer
As part of the commissioning of this appliance it is vital that the Log Book is completed and given to the Householder. Please
ensure that your customer is aware of the importance of keeping the Log Book safe as a record of the installation and the
appliance service history.
Please ensure that your customer is aware of the correct operation of the system, boiler and controls.
Содержание Calydra green 24 Nat
Страница 9: ...9 5 A Fig 11 A A A Fig 9 Fig 10 L Fig 8 Fig 12 Installing the Boiler continued ...
Страница 23: ...23 ...