Benchmark 1500 - 2000 Boilers
CHAPTER 2 – INSTALLATION
Page
18
of
184
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0097_0C
Ph.: 800-526-0288
GF-142
Figure 2-2: Boiler Lifting Provisions
In multiple unit installations, it is important to plan the position of each unit in advance. Sufficient
space for piping connections and future service/maintenance requirements must also be taken
into consideration. All piping must include ample provisions for expansion
.
If installing a Combination Control Panel (CCP) system, it is important to identify the
Combination Mode Boilers in advance and place them in the proper physical location. Refer to
Chapter 5 for information on Combination Mode Boilers.
LIFTING LUGS
(3 POSITIONS)
2” GAS INLET