16
Bell
fi res
Installation instructions
CLEARANCES
Mantel clearances
Any mantel piece made of combustible material should be placed at least 2" from the
side and top of the fi replace opening. Minimum mantel clearances are shown in fi gure
3 to 5.
Figure 3: Mantel clearances
12"
Max. depth
2" Min.
2" Max. depth
12" Min.
from opening
4
"
Min. to
combustible
2" Min.
from opening
Ceiling Minimum 20
"
from opening
(or place a non combustible
hearth (fl oor stone) with a depth
of minimal 12 in (30 cm) in front
of the full width of the glass)
Non combustible
Insulation plate / board
Combustible
mantel piece
Non combustible
Insulation plate / board
Содержание Corner Bell Large 3 L/R CF
Страница 2: ......
Страница 4: ...4 Bellfires Installation instructions ...
Страница 69: ...69 Bellfires Installation instructions DIMENSIONS VIEW BELL MEDIUM 3 Hidden Door ...
Страница 70: ...70 Bellfires Installation instructions OPERATING UNIT Dimensions in inches 9 7 12 4 11 3 2 14 ...
Страница 78: ...78 Bellfires Installation instructions ...
Страница 79: ......