4.3 Installation of the Supply control unit
DIN rail mounting
Wall mounting
Retainer
DIN rail
1
2
3
A3,5 x 32 screw (2 pcs.)
B2,9 x 9,5 screw (4 pcs.)
Protection lid (2 pcs.)
The accumulator will be connected to the terminals of the Supply control unit, after the
commissioning of the system.
4
.4
Installation of the Video connection box
DIN rail mounting
Wall mounting
7/17
Frontal view
Lateral view
Back view
Frontal view
Lateral view
Back view
Retainer
DIN Rail
1
2
3
A3,5 × 32 Screw (2 Pcs.)
B2,9 × 13 Screw
(
4 Pcs.)
Protection lid (2 St.)
Содержание advanced 2 families
Страница 103: ......
Страница 104: ...07 2014 USM KIT VPA 2F0 BLY ...