3) Lay the canvas out on top of the
groundsheet and using middle sized
pegs peg the bottoms of the walls
down right next to the corresponding
pegs in the ground sheet.
4) Now you need to do a one off stringing.
This will take around 15 mins but you only
need to do it the once.
The Touareg will then take around a total
of 10 mins to erect.
Lay all the ropes and sort them into long
and short.
5) Always keep the canvas on the groundsheet (to stop it getting stained) and tie
the short ropes to the points on either side with the adjuster on the end away
from the tent.