background image

SAFETY

The following recommendations should be carefully observed as part of any Elements

 Fireplace 

assembly.

1.  DO

 read and follow the Brighton Fireplace Installation Manual.

2.  DO NOT

 climb on top of the base or top unit of the fireplace. 

3.  DO NOT

 move the base or top of fireplace without the proper lifting equipment.

4.  DO NOT

 move the base or top unit of the fireplace without securing the unit with straps to the 

forks of the lifting device. Keep unit on supplied pallet until transported to final install location, 
then remove from pallet and place on foundation.

5.  DO NOT

 place the entire fireplace on an uneven footing.

6.  DO

 check with local building codes.

*Not following these guidelines can result or lead to equipment damage and/or serious injury.

IMPORTANT

When unloading, moving, or setting a modular unit, be sure that the unit is securely strapped 
(using a 5,000 lb. strap) to the equipment moving the unit to ensure it does not tip or fall. Serious 
damage to equipment and/or personal injury may result without it being properly secured. Please 
match appropriate machinery with the weight and size of unit being installed. 

- 4 -

SAFETY STRAP 5,000 LB.

Содержание ELEMENTS BRIGHTON

Страница 1: ...ELEMENTS OUTDOOR LIVING BRIGHTON FIREPLACE INSTALLATION MANUAL BELGARD COM ...

Страница 2: ...al building code requirements in your area Fireplaces typically have a minimum setback from all buildings It is also necessary to construct a properly compacted gravel base to set the fireplace on Before construction of the gravel pad it is necessary to establish Finish Grade height first to ensure the first course of the firepalce unit is buried 4 Once finished height has been determined construc...

Страница 3: ...and spark arestor Figure 1 A set aside for later install Figure 2 shows the base unit of the fireplace Figure 2 also shows the filler blocks or plugs that are used to fill the fork slots on the base unit Eight plugs are shipped with each fireplace Plugs may need to be shaved down to get a proper fit 3 FIGURE 1 TOP FIGURE 2 BASE B B B A A A A B FIGURE 1 A TERM TOP ...

Страница 4: ...until transported to final install location then remove from pallet and place on foundation 5 DO NOT place the entire fireplace on an uneven footing 6 DO check with local building codes Not following these guidelines can result or lead to equipment damage and or serious injury IMPORTANT When unloading moving or setting a modular unit be sure that the unit is securely strapped using a 5 000 lb stra...

Страница 5: ...table enough for support of the Elements structure The graded aggregate base material should not be placed directly on topsoil or other organic soils If the exposed soils are too soft to work with the excavation depth may need to be extended or an alternative foundation support system may be necessary Level and compact the exposed excavation base until it is firm and unyielding Once the excavation...

Страница 6: ...shed is to place the base unit Remember the first 4 are always buried After the base unit has been placed you can now put the top unit into place 6 TOP UNIT SPARK ARRESTOR PIPE NOTE Set top unit then install pipe until it snaps into place Then mount the spark arrestor BASE UNIT ...

Страница 7: ...h could be installed at this point The wood box set will tuck behind the two front side keystones while the hearth will sit flush and centered to the front of the fireplace Each wood box set will have 8 plugs and each hearth will have two plugs to be installed ...

Страница 8: ... base and top you will find a set of plugs that are used to fill the fork slots on the units Push the plugs in slowly until they are flush with the blocks next to them It is not necessary to glue them in place A PLUG A PLUG B PLUGS B PLUGS A PLUG A PLUG 8 ...

Страница 9: ... height has been determined construction of the concrete pad can be completed FIGURE B Sample framework for concrete pad FIGURE C Sample side view of completed concrete pad FIGURE B C A properly constructed level footing is required to place your bottom unit on If you are unfamiliar with soil conditions and the process of pouring a concrete footing please consult a professional masonry contractor ...