Installation GRS105/GRS106
Release 01 11/2021
39
6
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following work steps to install the device:
Installing the SD card (optional)
Installing an SFP transceiver (optional)
Connecting the terminal blocks
Filling out the inscription label
Note:
Note the safety instructions in
“Requirements for connecting electrical
6.1
Checking the package contents
Check whether the package includes each item named in the section
“Scope of delivery” on page 73
Check the individual parts for transport damage.
Содержание HIRSCHMANN GRS105
Страница 78: ......