
18
Location and Environment
Mounting the Masterpiece Control Surface into a Desk
Mounting the Control Surface into a 19” Rack
The Masterpiece Control Surface can be mounted into a standards 19” rack.
• Check that there is enough clearance for the connectors on the left side of the Control
Surface.
• The Control Surface is fastened to the rack system using 4x M6 (1/4 inch) screws (screws are
available from rack suppliers).
• Once fastened to the rack insert all of the connectors making sure that the external PSUs
do not hang from the side of the Control Surface, the PSUs have to be supported.
Screw
Holes
Screw
Holes
Содержание grass valley MASTERPIECE 12G-SDI
Страница 1: ...Installation Manual Issue 3 Rev 4 2020 01 29 MASTERPIECE MASTER CONTROL SWITCHER ...
Страница 14: ...xiv Notices ...
Страница 18: ...2 About this Manual Overview ...
Страница 42: ...26 Dimensions Masterpiece Mainframe Dimensions ...
Страница 48: ...32 Specifications Masterpiece 12G SDI and IP Mainframes ...