
Operation
METPOINT
®
OCV
55
1
-
Three-pole male receptacle M 16
For the transmission of the alarm, a three-pole cable box M 16 can be connected at position (1) at the evaluation unit.
Plug-and-socket connectors are operating resources that, when properly used (under voltage), must
not be plugged-in or disconnected.
Содержание METPOINT OCV
Страница 66: ...Declaration of conformity 66 METPOINT OCV 14 Declaration of conformity ...
Страница 73: ......
Страница 74: ......
Страница 75: ......