13.4 Work steps during the installation
It is strongly recommended to install a shut-off valve both upstream and downstream of the
CLEARPOINT
®
V.
To maintain the supply of compressed air during service failures, maintenance and repair works on the
CLEARPOINT
®
V, the installation of a bypass line around the CLEARPOINT
®
V is advisable. This bypass
line must have a shut-off valve.
Installation example with prefilter, afterfilter, shut-off valves and bypass:
To install the CLEARPOINT
®
V, proceed as follows:
Ensure that the conditions of use of the CLEARPOINT
®
V are met and that the operation limits
are not exceeded.
Ensure that the system is pressureless prior to integrating the CLEARPOINT
®
V into the
compressed-air system.
Prior to installation, it must be ensured that all possible contaminations are removed from the
compressed-air system.
Connect the following connections with your supply system or with your plant:
Compressed-air inlet (1)
Compressed-air outlet (2)
Carry out a leak test of the connections prior to the start-up.