Operation
34
Operating Instructions 1225-6 - 01.0 - 01/2021
4.10 Throw-over stacker
4.10.1 Operating the throw-over stacker
Fig. 14: Operating the throw-over stacker
The finished workpieces are stacked on the throw-over stacker.
Stacking the sewing material manually
To stack the sewing material manually:
1.
Press the F2 button (2).
A stacking process is carried out.
CAUTION
Risk of injury from moving parts!
Crushing possible.
Do NOT reach into the working area of the throw-
over stacker during stacking.
(1) - Pedal
(2) - Button F2
①
②
Содержание 1225-6
Страница 1: ...1225 6 Operating Instructions ...
Страница 6: ...Table of Contents 4 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 16: ...Safety 14 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 20: ...Machine description 18 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 62: ...Programming 60 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 72: ...Maintenance 70 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 86: ...Decommissioning 84 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 88: ...Disposal 86 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 94: ...Technical data 92 Operating Instructions 1225 6 01 0 01 2021 ...
Страница 95: ......