Installation
2
Installation
2.1 Space Requirements
•
Installation plate thickness: 1.5 - 7.5 mm (0.06 - 0.3 inch)
•
Space requirements when installing the operator panel:
187 mm
57 mm
100 mm
(4.0 inch)
50 mm
(2.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
(7.36 inch)
202 mm
100 mm
(4.0 inch)
(7.95 inch)
(2.24 inch)
Caution:
The openings on the enclosure are for air convection. Do not cover these openings.
2.2 Installation Process
1. Unpack and check the delivery. If damage is found, notify the supplier.
x 7
Panel cut out 166 x 149 mm
(6.54 x 5.87 inch)
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
Beijer Electronics, MAEN810D
7