
CH9720 Programmable DC Electronic Load Instructions Chapter III Menu Operation
- 25 -
value of point B. After typing the array, press
【
ENT
】
to confirm, the unit is ms.
Step 7:
After the setting is completed, press to enter the test and enter the test page
directly. Press the start button to start the measurement.
After the dynamic test is started, the load will continuously switch between the A value
and the B value, maintaining the width A and the width B, respectively.
I
Ib
Ia
Ta Tb Ta Tb t
Start up
Stop
3.2.7 List Test Page
The list test function can be automatically converted at a set time in different load modes.
For power products and chargers, through multi-parameter hybrid testing, you can more
fully understand the working characteristics of the tested products in various applications.
The instrument can set up up to 15 different types or sizes of loads, single-step
automatic test time 1 ~ 60000s, and can compare the current, voltage or power parameters
in each step of the test, make a pass or fail judgment, all set After the determined number of
steps is completed, the overall discrimination result (PASS/FAIL) is given in the status
information area. All the test steps are PASS, and any step is FAIL.
In the list test mode, after setting the minimum starting voltage in the load setting menu,
the whole process can be automatically measured without key operation. When the load is
judged to be higher than the minimum starting voltage input, the measurement is
automatically started, and the measurement sequence is stopped after completion.
Menu name
Secondary menu content