Beer Grill AG
Beer Grill GmbH
Allmendstrasse 7
Tel. +41 56 618 7800
Körnerstrasse 14 a
Tel. +49 71 61 659 876
CH
– 5612 Villmergen,
Switzerland
Fax +41 56 618 7849
D
– 79539 Lörrach,
Germany
Fax +49 71 61 659 879
www.beergrill.com
Assembly-Programming-Instructions_Cold-Rack_e_05-10-2018
Page 12
1.11 Two installation options
1.12 Air routing for self-cooled appliances
Serving-side
Serving-side
Variant 1
Air flow directly through the cooling unit, blown
out in a straight line.
Variant 2
Air intake and warm air outlet channelled on the
same side.
Optional: Additional fan
The air opening of the panelling is
less than 5
mm
from the condenser:
Air inlet for
cold air
Outlet opening
for warm air
Front of
condenser
housing
Removable
fan grille
housing
Counter
panelling
housing
Narrow gap
between the
condenser
housing and
panelling:
Close this gap
with sealing
tape.
Avoid the gap
between the
condenser housing
and panelling:
a) Close this gap
with wood or
sheet metal.
b) Pull the
condenser unit
forward to the
panelling.
Air inlet
for cold air
Front of
condenser
housing
Removable
fan grille
housing
Counter
panelling
housing
The air opening of the panelling is
more than 5
mm
from the condenser:
Outlet opening
for warm air
CORRECT!
INCORRECT!