BEDU POMPEN CT Скачать руководство пользователя страница 5

GB

these instructions.

i

  Follow the routine maintenance schedules and

the promptly replace damaged parts, this will 

allows the device to work in the best conditions.

Use only original spare parts provided from 

Bedu

 

Pompen  BV 

or from an authorized distributor.

  Don’t remove or change the labels placed on 

the device. 

Do not start the device in case of defects or damaged 

parts.

  Maintenance operations, requiring full or partial 

disassembly of the device, must be done only 

after disconnection from the supply.

4.2. Safety devices

The device has an external case that prevents any 

contact with internal parts.

4.3. Residual risks

The appliance, designed for use, when used in-line 

with the design and safety rules, doesn’t have residual 

risks.

4.4. Information and Safety signals

For this kind of product there will not be any signals 

on the product.

4.5. Individual protection devices

During installation, starting and maintenance it is 

suggested to the authorized operators to consider  

the use of individual protection devices suitable for 

described activities.

During ordinary and extraordinary maintenance 

interventions, safety gloves are required.
Signal  

individual protection device

HAND PROTECTION

(gloves for protection against chemical, 

thermal and mechanical risks).

5. TRANSPORTATION AND HANDLING

The product is packed to maintain the content intact.

During transportation avoid to stack excessive weights. 

Ensure that during the transportation the box cannot 

move.

It is not necessary to use any special vehicle to

transport the packaged device.

The transport vehicles must comply, for the weight and 

dimensions, with the chosen product (see technical 

catalogue dimensions and weights).

5.1. Handling 

Handle with care, the packages must not receive 

impacts.

Avoid to impact onto the package materials that could 

damage the pump.

If the weight exceeds 25 Kg the package must be 

handled by two person at the same time.

6. INSTALLATION
6.1. Dimensions

For the dimensions of the device (see technical 

catalogue).

6.2.  Ambient requirements and installation site 

dimensions

The customer has to prepare the installation site in 

order to guarantee the right installation and in order to 

fulfill the device requirements (electrical supply, etc...).

The place where the device will be installed must fulfill 

the requirements in the paragraph 3.2.

It's Absolutely forbidden to install the machine in an 

environment with potentially explosive atmosphere.

6.3. Unpacking

i

  Inspect the device in order to check any

damages which may have occurred during 

transportation.

Package material, once removed, must be discarded/

recycled according to local laws of the destination 

country.

6.4. Installation

The pumps must be installed with the rotor axis in the 

horizontal position and with the feet under the pump.

Place the pump as close as possible to the suction 

source.

Provide space around the pump for motor ventilation, 

to allow for checking of shaft rotation.

6.4.1. Pipes

Ensure the insides of pipes are clean and unobstructed 

before connection.

ATTENTION: The pipes connected to the pump 

should be secured to rest clamps so that they 

do not transmit stress, strain or vibrations to the 

pump. 

Tighten the  pipes or union coupling to the extent 

sufficient to ensure a tight seal.

Excessive torque may cause damage to the pump.

When  the  pipe  or  union  coupling  is  mounted,  keep 

the pump casing connection blocked with a second 

wrench, making sure the connection is not deformed 

by excessive tightening.

The pipe diameters must not be smaller than the pump 

connections.

6.4.2. Suction pipe

The suction pipe must be perfectly airtight and be led 

upwards in order to avoid air pockets.

With  a  pump  located  above  the  water  level  (suction 

lift operation) fit a foot valve with strainer which must 

always remain immersed.

If operating with flexible hoses use a reinforced spiral 

suction hose, in order to avoid the hose narrowing due 

to suction vacuum.

With  the  liquid  level  on  the  suction  side  above  the 

pump (inflow under positive suction head) fit an inlet 

gate valve.

For  suction  from  a  storage  tank  fit  an  anti-backflow 

valve. Follow local specifications if increasing network 

pressure.

Install a strainer on the suction side of the pump to 

prevent foreign particles from entering the pump.

CT,T, TP,  Rev24.indd   10

15/01/18   15:46

Содержание CT

Страница 1: ...OPERATING INSTRUCTIONS Close coupled peripheral pumps CT T TP ...

Страница 2: ...CT T TP Rev24 indd 1 15 01 18 15 46 www bedu nl ...

Страница 3: ... cable chapter 6 5 The type of electrical protection to be installed chapter 6 5 1 1 Symbols To improve the understanding of the manual below are indicated the symbols used with the related meaning Information and warnings that must be observed otherwise there is a risk that the machine could damage or compromise personnel safety The failure to observe electrical information and warnings could dam...

Страница 4: ...or the purpose described in paragraph 2 1 Improper use of the device is forbidden as is use under conditions other than those indicated in these instructions Improper use of the product reduces the safety and the efficiency of the device Bedu shall not be responsible for failure or accident due to improper use 2 3 Marking The following picture is a copy of the name plate that is on the external ca...

Страница 5: ...ements and installation site dimensions The customer has to prepare the installation site in order to guarantee the right installation and in order to fulfill the device requirements electrical supply etc The place where the device will be installed must fulfill the requirements in the paragraph 3 2 It s Absolutely forbidden to install the machine in an environment with potentially explosive atmos...

Страница 6: ...p is located above the water level suction lift operation or with a positive suction head which is too low less than 1 m to open the non return valve fill the pump through the priming hole When the liquid level on the suction side is above the pump inflow under positive suction head fill the pump by opening the suction gate valve slowly and completely keeping the delivery gate valve open to releas...

Страница 7: ...g For dismantling and re assembly see construction in the cross section drawing To remove the impeller 28 00 T TP use the threaded dismantling holes 9 DISPOSAL OFF The final disposal of the device must be done by specialized company Make sure the specialized company follows the classification of the material parts for the separation Observe the local regulations and dispose the device accordingly ...

Страница 8: ...See point 2a also 4 Insufficient flow 4a Pipes and accessories with diameter too small causing excessive loss of head 4b Presence of deposits or solid bodies in the internal passages of the rotor 4c Rotor deteriorated 4d Worn rotor and pump case 4e Excessive viscosity of the liquid pumped if other than water 4f Incorrect direction of rotation 4g Suction head excessive in relation to the suction ca...

Страница 9: ...2 12 20 81 00 82 04 94 02 76 04 94 00 76 54 98 00 98 08 14 00 98 04 70 00 14 04 82 00 90 00 88 00 3 94 112 28 20 28 00 12 00 14 20 3 94 114 14 00 14 24 12 24 32 00 14 12 3 94 113 14 00 32 00 14 24 76 16 14 12 14 00 12 00 3 94 059 T 76 TP 80 T 100 TP 100 T 125 TP 132 T 61 65 70 TP 78 CT T TP Rev24 indd 62 15 01 18 15 46 ...

Страница 10: ...wing for dismantling and assembly 组装与分解图 CT 61 Tab 1 TAB 1IEC 60335 1 A mm 2 Corrente nominale dell apparecchio Rated current of appliance Bemessungsstrom des Gerätes 设备额定运行电流 Sezione nominale Nominal cross sectional area Nennquerschnitt 导体额定截面积 3 6 10 16 25 32 40 0 75 1 0 1 5 2 5 4 6 10 6 10 16 25 32 40 63 13 1 Minimum cross sectional area of conductors CT T TP Rev24 indd 63 15 01 18 15 46 ...

Страница 11: ...gnetic compatibility Standards EN ISO 12100 2010 EN IEC 60204 1 2006 EN 809 A1 C1 Additional information No further details Declaration We hereby declare under our sole responsibility that the product s mentioned above to which this declaration relates complies with the above mentioned standards and Directives BEDU Pompen BV Poort van Midden Gelderland Rood 10 6666 LT Heteren Tel 31 0 88 4802 900 ...

Страница 12: ......

Страница 13: ...orking from our own workplace or at your location A fast and appropriate solution for all your issues Wide range of liquid pumps Repair maintenance and revision made for your process BEDU POMPEN B V Poort van Midden Gelderland Rood 10 6666 LT HETEREN Nederland Telefoon 31 0 88 4802 900 E mail info bedu eu WWW BEDU EU BEDU BELGIUM B V B A Industriepark West 75 9100 SINT NIKLAAS België Telefoon 32 0...

Отзывы: