Commissioning
EL72x1-901x
69
Version: 1.9
Fig. 61: Choose target system (remote)
In this sample "Runtime system 1 (port 801)" is selected and confirmed. Link the PLC with the real-time
system via menu option "Online" → "Login", the F11 key or by clicking on the symbol
. The control
program can then be loaded for execution. This results in the message "No program on the controller!
Should the new program be loaded?", which should be acknowledged with "Yes". The runtime environment
is ready for the program start:
Содержание EL72 1-901 Series
Страница 1: ...Documentation EL72x1 901x Servo Motor Terminals with OCT and STO 50 V DC 1 9 2020 02 18 Version Date...
Страница 2: ......
Страница 6: ...Table of contents EL72x1 901x 6 Version 1 9...
Страница 20: ...Product overview EL72x1 901x 20 Version 1 9 2 3 Technical data...
Страница 49: ...Installation EL72x1 901x 49 Version 1 9 Fig 36 Shield busbar Fig 37 Shield busbar clamp...
Страница 86: ...Commissioning EL72x1 901x 86 Version 1 9 Fig 88 Incorrect driver settings for the Ethernet port...
Страница 140: ...Commissioning EL72x1 901x 140 Version 1 9 0hex 80hex Fault reset 6hex Shutdown 7hex Switch on Fhex Enable operation...
Страница 141: ...Commissioning EL72x1 901x 141 Version 1 9 Fig 176 DS402 State Machine...
Страница 150: ...Commissioning EL72x1 901x 150 Version 1 9 Fig 184 Touch Probe inputs...
Страница 172: ...Commissioning EL72x1 901x 172 Version 1 9 Fig 207 Process Data tab SM2 EL72x1 0010 default...
Страница 256: ...Appendix EL72x1 901x 256 Version 1 9 9 5 Certificates Fig 233 EL72x1 9014_Certificate...