Beckhoff C6250-0060 Скачать руководство пользователя страница 12

Installation Instructions 

 

 

 

Installation Instructions 

 

Please also refer to chapter 

General instructions

  
 

Transport and Installation 

 

The specified storage conditions must be observed (see chapter 

Technical 

data

). 

 

Transport 

 

Despite the robust design of the unit, the components are sensitive to 
strong vibrations and impacts. During transport, your Industrial PC should 
therefore be protected from excessive mechanical stress. Therefore, 
please use the original packaging. 

 

Warning

 

 
Danger of damage to the unit! 
If the device is transported in cold weather or is exposed to extreme 
variations in temperature, make sure that moisture (condensation) does not 
form on or inside the device. 
 
Prior to operation, the unit must be allowed to slowly adjust to room 
temperature. Should condensation occur, a delay time of approximately 12 
hours must be allowed before the unit is switched on. 

 

Unpacking 

 
 

Proceed as follows to unpack the unit: 
 

1. Remove  packaging. 
2. Do not discard the original packaging. Keep it for future relocation. 
3. Check the delivery for completeness by comparing it with your order. 
4. Please keep the associated paperwork. It contains important 

information for handling the unit. 

5. Check the contents for visible shipping damage. 
6. If you notice any shipping damage or inconsistencies between the 

contents and your order, you should notify Beckhoff Service. 

 

 

10

 

C6250 

Содержание C6250-0060

Страница 1: ...Installation and Operating instructions for Control Cabinet PC C6250 up to 0060 Version 1 6 Date 2018 02 16...

Страница 2: ......

Страница 3: ...6250 0060 9 PS 2 connections 9 Serial interfaces 9 USB interfaces 9 Network connection 9 Sound On Board 9 DVI I Digital Visual Interface 9 DVI D Digital Visual Interface 9 DisplayPort 9 Additional plu...

Страница 4: ...hoff s branch offices and representatives 19 Beckhoff headquarters 19 Beckhoff Support 19 Beckhoff Service 19 Assembly dimensions 20 Appendix 22 Technical data 22 Approvals 22 FCC Federal Communicatio...

Страница 5: ...TwinSAFE and XFC are registered trademarks of and licensed by Beckhoff Automation GmbH Other designations used in this publication may be trademarks whose use by third parties for their own purposes...

Страница 6: ...whenever the PC is being used for purposes other than plant control such as during functional tests following repair all parts of the equipment must first be switched off after which the Industrial PC...

Страница 7: ...will be national regulations for the control of such machines and plant that the operator must observe These regulations cover amongst other things the intervals between inspections of the controller...

Страница 8: ...250 Similar photograph Opening the housing To open the PC housing initially rotate the two fast closing screws see photograph above by 90 degrees in either direction using a screwdriver The inner chas...

Страница 9: ...cription View of the open PC Under the housing cover 1 is a 7 slot computer core with standard ATX motherboard 2 and power supply unit 3 The connections are located at the front of the housing 4 1 3 2...

Страница 10: ...ated in the upper part of the first slot right beside the ATX slot Video connection Video A 15 pin SUB D socket connector 5 allows a VGA monitor to be connected USB interfaces USB1 USB4 The four USB i...

Страница 11: ...ASE T Local Area Network LAN LAN2 The RJ 45 connector X113 allows the PC to be connected to a 10 100 1000BASE T Local Area Network LAN Sound On Board Sound The Industrial PC has a on board interface w...

Страница 12: ...ons in temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur...

Страница 13: ...ure adequate space for ventilation and for opening the PC must be provided The clearance above and below the housing must be at least 50 mm in order to ensure adequate ventilation of the PC Warning Ex...

Страница 14: ...CSA A 15 A Length of stripped conductor 8 to 9 mm Supplied mains power unit The Industrial PCs is either fitted with a 100 240 V 50 60 Hz power supply unit standard or with a 24 VDC power supply unit...

Страница 15: ...housing in order to assemble the PC power supply cable Materials for assembly of the connector Female plug connector Strain relief housing Female plug connector is correspondingly coded This female p...

Страница 16: ...Pin Function 1 2 24V DC Power supply 3 4 not used 5 not used 5 4 2 3 1 Fitting the connector to the cable The plug is fitted to the cable as follows 1 Strip insulation from the cable ends Follow the...

Страница 17: ...s that are to be connected Connect all data transfer cables if present to the appropriate plug in receptacles of the data telecommunication networks Reconnect all devices to the power supply Check vol...

Страница 18: ...software is writing a file to the hard disk the file will be destroyed Control software typically writes something to the hard disk every few seconds so that the probability of causing damage by swit...

Страница 19: ...identical type or an alternative type recommended by the manufacturer Notice correct polarity Handling of Lithium Batteries Danger Lithium Batteries should not be recharged exposed to fire opened and...

Страница 20: ...and press any key Check the setup settings Call Beckhoff Service Computer boots software starts but control does not operate correctly Cause of the fault is either in the software or in parts of the p...

Страница 21: ...0 D 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 e mail info beckhoff com Beckhoff Support Support offers you comprehensive technical assistance helping you no only with the applicat...

Страница 22: ...nsions The following pages show diagrams of the Industrial PC with dimensions in mm Warning The assembly of the unit must take place with the orientation diagrammed here Horizontal Installation Side V...

Страница 23: ...Warning The assembly of the unit must take place with the orientation diagrammed here Vertical Installation Side View Front View Top View C6250 21...

Страница 24: ...storage The same values for atmospheric humidity and shock resistance are to be observed during transport and storage as in operation The shock resistance during transport can be improved by means of...

Отзывы: