Beckhoff C6027 Скачать руководство пользователя страница 30

Commissioning

C6027

30

Version: 1.1

4.4

Switching the Industrial PC on and off

First switching on and driver installation

NOTE

Public networks

Connecting the PC to public networks without additional protective measures can compromise the safety of
the device.

• Protect the PC before connecting it to public networks.

The Industrial PC is started when the system is switched on or when the power supply is connected.

When you switch on the Industrial PC for the first time, the pre-installed operating system (optional) will be
started. For any additional hardware you have connected, you have to install the drivers yourself afterwards.
In addition, the Beckhoff Device Manager starts automatically. The Device Manager is a software from
Beckhoff that supports you in configuring the PC.

If you have ordered the PC without an operating system, you must install this and the driver software for the
additional hardware you have connected and for the devices in the PC yourself. Please follow the
instructions in the documentation for the operating system and the additional devices.

Switching off the Industrial PC

NOTE

Data loss due to running software

Switching off the Industrial PC before the running software is terminated and the operating system is shut
down can lead to data loss.

• Quit the running software and shut down the operating system before switching off the PC.

When the system is switched off or disconnected from its own power supply, the Industrial PC is also
switched off.

To shut down the operating system properly, you can install an additional ON/OFF switch next to the
machine's main switch to turn the machine on and off. The main switch can thus remain switched on in
principle and thus ensures that the PC is still supplied with power during the shutdown of the operating
system.

If 24 V is then applied to the input PC_ON via a switch, the operating system shuts down properly. The
PC_ON signal is inverted, i.e. the operating system shuts down when 24 V is applied.

Once the operating system has shut down, the PC power supply unit sets the output power status from 24 V
to 0 V. This indicates that the shutdown is complete and you can turn off the power supply. Via the output,
you can switch, for example, a contactor that switches off the entire system. The maximum load for the
Power Status output is 0.5 A and a suitable fuse should be provided.

You can assign different access rights to all users in the operating system and in the application software.
Since there is a risk of data loss if the Industrial PC is switched off incorrectly, assign the rights advisedly. A
user who is not allowed to terminate the software should not be allowed to switch off the Industrial PC.

Содержание C6027

Страница 1: ...Manual EN C6027 Industrial PC 12 2 2021 Version 1 1...

Страница 2: ......

Страница 3: ...1 UPS OCT LED 17 3 4 2 PWR LED 18 3 4 3 HDD LED 18 3 4 4 TC LED 18 3 5 Name plate 19 3 6 1 second UPS 20 4 Commissioning 21 4 1 Transport and unpacking 21 4 2 Installation in the control cabinet 22 4...

Страница 4: ...Table of contents C6027 4 Version 1 1 8 Troubleshooting 41 9 Technical data 42 10 Appendix 43 10 1 Service and support 43 10 2 Approvals 44...

Страница 5: ...rations depicted may deviate from the standard Trademarks Beckhoff TwinCAT TwinCAT BSD TC BSD EtherCAT EtherCAT G EtherCAT G10 EtherCAT P Safety over EtherCAT TwinSAFE XFC XTS and XPlanar are register...

Страница 6: ...th or serious injuries WARNING Disregarding the safety notice may lead to death or serious injuries CAUTION Disregarding the safety notice may lead to minor injuries Warning of damage to property NOTE...

Страница 7: ...of power consumption and power dissipation please refer to the respective data sheet Ensure that only trained specialists with a control and automation engineering background operate the Industrial P...

Страница 8: ...rks The latter should be connected to the corporate network or the Internet only if appropriate protective measures have been set up In addition the recommendations from Beckhoff regarding appropriate...

Страница 9: ...o the available processors the Industrial PC can be used for the following applications among others diverse automation and visualization tasks wide range of IoT tasks with data preprocessing complica...

Страница 10: ...Protective conductor connection PE Low resistance protective earthing and functional earthing of the Industrial PC 4 Name plate Information on the equipment of the Industrial PC 5 Side cover Access to...

Страница 11: ...Voltage socket pin numbering Table 2 Voltage socket pin assignment Pin Signal Description 1 ON PC_ON input 2 P S Power status output 3 GND 0 V 4 24 V Power supply The plug for the power supply is spec...

Страница 12: ...llows based on the device generation Table 3 Controller classification based on device generation Device generation Controller C6027 0000 Intel i219 PHY for LAN1 and Intel i210 MAC PHY for LAN2 and LA...

Страница 13: ...nically fused All ports are protected by a common overcurrent protection overcurrent detection All ports will be switched off if overcurrent occurs at any of the ports 1 2 3 4 4 3 2 1 1 2 3 4 4 3 2 1...

Страница 14: ...rt signals are led out via the interface by default With the use of a level shifter cable the board switches the DisplayPort specification automatically to HDMI signals 1 2 19 20 X105 Fig 5 C6027_Disp...

Страница 15: ...ering options are available 6x Ethernet adapter with 100 1000BASE T connection order designation C9900 E318 Any interfaces that are ordered are installed ex factory They extend the connection area at...

Страница 16: ...e Intel i210 MAC PHY is used as the controller for all six ports 1 8 1 1 8 8 1 8 1 1 8 8 Fig 7 C6027_Optional Ethernet interfaces pin numbering Table 7 Ethernet interface pin assignment Pin Signal Des...

Страница 17: ...he transmission quality of the UPS OCT signals UPS stands for the uninterruptible power supply One cable technology OCT enables the communication between PC and UPS to be transmitted together with the...

Страница 18: ...arting start sequence is being run through Magenta Flashing 0 5 s S UPS capacitance test if S UPS exists Red magenta Flashing Checksum error during the I2C transmission in the bootloader Cyan Flashing...

Страница 19: ...e last four digits indicate the product variant 3 Serial number BTN 4 UPS OCT LED 5 Date of manufacture 6 Power LED 7 Mainboard 8 CPU 9 Hard disk LED 10 Main memory 11 Storage medium 12 TwinCAT LED 13...

Страница 20: ...S under the order designation C9900 U334 The capacitive 1 second UPS continues to supply the processor with power if the power supply fails During this period persistent data can be saved which are av...

Страница 21: ...Industrial PC in particular the original packaging can improve the vibration resistance during transport NOTE Hardware damage due to condensation Unfavorable weather conditions during transport can c...

Страница 22: ...the Industrial PC with four Torx TX10 screws and a tightening torque of approx 0 5 Nm Mounting plate 3 at the rear of the Industrial PC with two Torx TX10 screws and a tightening torque of approx 0 5...

Страница 23: ...ndustrial PC according to the desired cable routing in the control cabinet In the case of mounting plates 1 and 3 the device can only be mounted via the rear panel in the control cabinet see fig 12 1...

Страница 24: ...ounting plate 1 91 2 1 45 1 27 4 2 1 36 7 1 4 5 69 3 20 40 Fig 14 C6027 _mounting plate rear panel Fig 15 shows the dimensions using the mounting option with the connections pointing to the right with...

Страница 25: ...ons 24 You need M4 screws for mounting After you have drilled the holes for the fastening screws in the control cabinet you can mount the Industrial PC in the control cabinet with mounting plates 1 or...

Страница 26: ...e of the adapter into the DIN rail A 2 Push the device upwards so that the spring contacts of the adapter are pressed in B 3 Keep the device pressed upwards and also hook the upper side of the adapter...

Страница 27: ...perating the device The cabling of the Industrial PC in the control cabinet must be done in accordance with the standard EN 60204 1 2006 PELV Protective Extra Low Voltage The PE conductor protective e...

Страница 28: ...PC and thus avoid dangerous touch voltages EMC NOTE Hardware damage due to electromagnetic interference Using the Industrial PC without functional earthing can lead to hardware damage due to electroma...

Страница 29: ...trial PC 28 and then plug in all data transfer cables Connecting the power supply Cables with a maximum cable cross section of 1 5 mm2 can be used for connecting the power supply For long supply lines...

Страница 30: ...is shut down can lead to data loss Quit the running software and shut down the operating system before switching off the PC When the system is switched off or disconnected from its own power supply t...

Страница 31: ...using the Beckhoff Device Manager to remotely configure the Industrial PC via a web browser More detailed information is available in the Beckhoff Device Manager manual First start Beckhoff Device Man...

Страница 32: ...passwords are an important prerequisite for a secure system Beckhoff supplies the device images with standard user names and standard passwords for the operating system It is imperative that you chang...

Страница 33: ...hock Never disconnect the cables from the device during thunderstorms Before you remove the Industrial PC from the control cabinet you must follow the following steps 1 Shut down the operating system...

Страница 34: ...e PC until the fastening screws slide into the keyholes see Fig 23 3 Remove the PC from the control cabinet You have successfully disassembled the PC Fig 23 C6027 _Position of the fastening screws Dis...

Страница 35: ...Dispose of the components in the following way Send plastic parts polycarbonate polyamide PA6 6 for plastics recycling Take metal parts to the metal recycling collection point Electronic parts such as...

Страница 36: ...and the replacement of other device components contribute to this Repair Only the manufacturer may repair the device If a repair should be necessary contact Beckhoff Service see Chapter 10 1 Service...

Страница 37: ...ponents Component Recommendation for replacement intervals years UPS battery pack 5 years 2 5 inch hard disk 5 years or after 20 000 operating hours at more than 40 C or after 30 000 operating hours a...

Страница 38: ...n body by touching grounded metal e g control cabinet door Wear a wrist grounding strap Only remove new electronic components from the ESD packaging tinted plastic bag after putting on the wrist groun...

Страница 39: ...should only be obtained from Beckhoff Service see Chapter 10 1 Service and support Table 15 Technical data of the battery Battery type Electrical properties at 20 C Dimensions Nominal voltage Nominal...

Страница 40: ...h are designed for a particularly long data preservation For more information on the function of the BST please refer to the corresponding documentation If your storage medium is defective and there i...

Страница 41: ...PC Other cause Check the power supply cable Call Beckhoff Service The Industrial PC does not boot fully Setup settings are incorrect Other cause Check the setup settings Call Beckhoff Service Computer...

Страница 42: ...n EN 60068 2 6 10 to 58 Hz 0 035 mm 58 to 500 Hz 0 5 G approx 5 m s2 Shock resistance shock EN 60068 2 27 5 G approx 50 m s2 duration 30 ms EMC interference immunity conforms to EN 61000 6 2 EMC inter...

Страница 43: ...can be found on the name plate Beckhoff Support Support offers you comprehensive technical assistance helping you not only with the application of individual Beckhoff products but also with other wid...

Страница 44: ...hese limits are designed to provide adequate protection against adverse interference if the device is used in a commercial environment This device generates uses and may emit radio frequency energy an...

Страница 45: ...7 _Mounting options for mounting plate 2 23 Fig 14 C6027 _mounting plate rear panel 24 Fig 15 C6027 _Mounting plate side panel 24 Fig 16 C6027 _Mounting plate DIN rail adapter 24 Fig 17 C6027 _Mountin...

Страница 46: ...Pin assignment of DisplayPort 14 Table 7 Ethernet interface pin assignment 16 Table 8 Meaning of the UPS OCT LED 17 Table 9 Meaning of the PWR LED 18 Table 10 Meaning of the HDD LED 18 Table 11 Meani...

Страница 47: ......

Страница 48: ...Beckhoff Automation GmbH Co KG H lshorstweg 20 33415 Verl Germany Phone 49 5246 9630 info beckhoff com www beckhoff com More Information www beckhoff com C6027...

Отзывы: