Beckett AFII Скачать руководство пользователя страница 14

14

Start Up Burner and Set 

Combustion

Set the thermostat substantially above room 

temperature.
Close the line voltage switch to start the burner. 

If the burner does not start immediately you may 

have to reset the safety switch of the burner primary 

control.
Priming the Pump
Prepare the burner for priming by attaching a 

clear plastic hose over the bleed port 

fi

 tting and 

fully opening the pump bleed port.  Use a suitable 

container to collect purged oil.
Initiate a call for heat.
After the burner starts, press and hold the reset 

button for 15 seconds until the yellow light turns on.  

This indicates that the button has been held long 

enough.
Release the reset button.  The yellow light will turn 

off and the burner will start up again.
At burner start up, click the reset button while the 

igniter is still on.  This will transition the control 

to a dedicated Pump Prime mode, during which 

the motor, igniter, and valve are powered for four 

minutes.  The yellow light will be on.
Bleed the pump until all froth and bubbles are 

purged.  If desired, terminate the call for heat or 

hold the reset button for at least one second to exit 

Pump Prime mode and return to Standby.
At the end of 4 minutes, the yellow light will turn off 

and the control will automatically return to standby 

mode.  
If prime is not established during the four minute 

pump prime mode, return to the previous steps 

to re-enter Pump Prime mode.  Repeat Step 5 

until the pump is fully primed and the oil is free of 

bubbles..
For R7184 primary controls, see part number 61351 

or 61465, for special pump priming sequence.
Prepare for combustion tests by drilling a 1/4” 

sampling hole in the 

fl

 ue pipe between the 

appliance and the barometric draft regulator.
Initial air adjustment — Using a smoke tester, adjust 

the air dial (and change 

fi

 ring pin on HLX ATC’s, if 

necessary) to obtain a clean 

fl

 ame. Now the additional 

combustion tests with instruments can be made.

Set combustion with instruments           

3.

4.

5.
6.

7.
8.

9.

10.

11.

12.

13.

14.

15.

16.

Wire Burner

Make connections to the control’s terminals as 
shown in 

Figures 8a 

and

 8b

.  Refer to the label on 

the underside of the control for wiring details.
Note: Motor-off delay on a 7505P will be disabled if 
the safety and operating limits as shown in 

Figures 

8a and 8b

 interrupt power to the control terminal L1.

Connect thermostat leads to the TR and TW 
terminals on the control or jumper the TR and TW 
terminals on the control, as directed by the appliance 
wiring diagram.

 

- Thermostat anticipator Current: 0.1 amp

 

- Thermostat voltage: 24 volts AC

Note that 

i

f the thermostat short cycles or operates 

improperly, it may require an isolation relay for proper 
operation.  The Beckett A/C Ready Kit (part no. 51950U) 
provides this function.  Wiring instructions are included 
with the A/C Ready Kit.

Some Thermostats Are Polarity 
Sensitive. Reversed polarity 

could cause erratic cycling of the burner control.

Connect the wire from the R

H

 or R terminal on the 

thermostat to the TR terminal on the control.  Connect 
the wire from the W terminal on the thermostat to the TW 
terminal on the control.

Open the shutoff valves in the oil supply line to the 
burner.
Open the air dial. This is an initial air setting for 
the pump bleeding procedure only. Additional 
adjustments must be made with instruments.

1.

2.

Section: Start Up Burner and Set Combustion

Oil-Burning Equipment 
shall be connected to 

fl

 ues 

having suitable pressure (draft) at all times 
to assure safe and proper operation of the 
burner.

Allow the burner to run for approximately 5 to 10 
minutes.
Set the stack or over-

fi

 re draft to the level speci

fi

 ed 

by the appliance manufacturer.

1.

2.

Hot Gas Puff-Back and 
Heavy Smoke Hazard

Failure to prime the pump properly could result in 

unstable combustion, hot gas puff-back and heavy 

smoke.

Do not allow oil to spray into a hot combustion 
chamber while bleeding air from the pump.
Install a gauge in the nozzle discharge port tubing 
or fully open the pump bleed valve to prevent oil 
spray from accumulating in the combustion chamber 
during the air bleed procedure.
Ensure that all bubbles and froth are purged from the oil 
supply system before tightening the pump bleed valve.
Ensure that the appliance is free of oil and oil vapor 
before starting or resetting the burner.

y

y

y

y

Содержание AFII

Страница 1: ...tion start up or service work Save this manual for future reference y y y Incorrect installation adjustment or misuse of this burner could result in death severe personal injury or substantial propert...

Страница 2: ...2...

Страница 3: ...nce Weekly Check your oil tank level Always keep your oil tank full especially during the summer in order to prevent condensation of moisture on the inside surface of the tank y y y y y Remainder of m...

Страница 4: ...t the air inlet openings to the burner or the combustion air ventilation openings in the room y y y y y Please read and understand the manual supplied with this equipment This equipment must be instal...

Страница 5: ...50 GPH Input Min Max 56 000 210 000 Btu h FBX Heads Firing rate 0 40 1 35 GPH Input Min Max 56 000 189 000 Btu h Certification Approvals UL listed to comply with ANSI UL296 and CSA B140 0 Fuels USA No...

Страница 6: ...ew Head Design HLX30 HLX50 HLX70 HLX90 HB AF2 6 0 4 0 85 gph 0 65 1 00 gph 0 75 1 35 gph HLX30 HLX50 HLX70 HLX90 HC AF2 9 N A 0 65 1 00 gph 0 75 1 50 gph HLX30 HLX50 HLX70 HLX90 HD AF2 6 0 40 0 85 gph...

Страница 7: ...test editions of the NFPA 31 and CSA B139 regarding providing adequate air for combustion and ventilation y y Failure to provide adequate air supply could seriously affect the burner performance and r...

Страница 8: ...tape on fuel oil fittings Tape fragments can lodge in fuel line components and fuel unit damaging the equipment and preventing proper operation Use oil resistant pipe sealant compounds y y y Damage t...

Страница 9: ...ance limit circuit Please note that other control manufacturers may use different wire colors for power and limit connections Special wiring required with covered burners The mounting plate is not a c...

Страница 10: ...t and safety controls are installed and functioning correctly as specified by the manufacturer applicable safety standards codes and all authorities having jurisdiction Ensure that the appliance is fr...

Страница 11: ...the cad cell 6 7 8 9 Typical Burner Sequence of Operation for GeniSys 7505 Control Refer to the appliance manufacturer s wiring diagram for actual specifications Standby The burner is idle waiting fo...

Страница 12: ...from Restricted Hard Lockout Valve on Delay Trial for Ignition Ignition Carryover Go to Pump Prime see Priming the Pump above Disable the Burner Any time the burner is running press and hold the rese...

Страница 13: ...ignition and motor are turned on for a 15 second valve on delay TRIAL FOR IGNITION TFI The fuel valve is opened A flame should be established within the 15 second lockout time LOCKOUT If flame is not...

Страница 14: ...s terminals as shown in Figures 8a and 8b Refer to the label on the underside of the control for wiring details Note Motor off delay on a 7505P will be disabled if the safety and operating limits as s...

Страница 15: ...he section Set combustion with test instruments It is good practice to make a record of the service performed and the combustion test results Natural Draft Applications typically over fire draft is 0...

Страница 16: ...plined nut Remove the nozzle line assembly from the burner being careful not to damage the electrodes or insulators while handling Stop halfway to remove igniter transformer wires To replace the nozzl...

Страница 17: ...adapter Push the head support until it stops against the nozzle shoulder Verify the dimension between the nozzle face and the back of the head is 5 32 10 Check Adjust Electrodes Check the electrode ti...

Страница 18: ...g Rate 140 psig AFII 85 AFII 100 AFII 150 0 40 0 65 3 0 60 0 75 4 3 0 70 0 85 5 4 0 75 1 00 5 2 0 95 1 20 3 1 15 1 35 4 1 25 1 50 5 FBX Firing Rate Head AFII 85 AFII 100 AFII 150 FB0 0 40 0 65 0 55 0...

Страница 19: ...and pricing Contact your Beckett representative for available pre and post time settings Item Description Kit No 1 Air tube combination Specify 2 Blower Wheel AFII 85 4 1 4 AFII 100 4 1 2 AFII 150 4...

Страница 20: ...copy of warranty form 61545 please choose one of the following options Visit our website at www beckettcorp com warranty Email your request to rwb customer service beckettcorp com Write to R W Beckett...

Отзывы: