BDS 740SPCU-1220 Скачать руководство пользователя страница 5

NO SCALE

DATE

DATE

DRAWN

APPD

REV

1/20/09

 4/18/20

KLB

RBB

LIGHTED WINDSOCKS 
INSTALLATION (Mech)

www.LightedWindsocks.com

LIGHTED WINDSOCK FRAME - Pipe Connection

Mounting Hardware

NOTES

1. The above is a guide for installing a BDS lighted windsock frame assembly. The installer must
    decide whether to use a 1” or larger support pipe for the installation. Everything below the 
    shown pipe connect must be supplied “By Others”.
2. The wiring cable that supplies power to the windsock frame and top beacon when ordered is 
    not shown in this drawing. Support for the bottom support pipe is “By Others”. 
3. The BDS supplied 1” (ID) threaded connection has a 1.315 nominal outside diameter. 
4. Galvanized schedule 40 pipe available at any good plumbing supply house.  
5. Suggest using a Antiseize lubrication or lubrication tape around piping threads prior to 
    assembly for corrosion prevention and easy assembly and disassembly if necessary.  

Windsock frame 
1” (ID) mounting 
pipe connection.
Supplied by
BDS Systems. 

1” coupling 

supplied by

BDS Systems

1 ½ ” X 1” reducer 
coupling shown. 
Supplied 
“By Others”

1 ½”  support pipe
supplied
“By Others”

1” support pipe
supplied
“By Others”

Using a coupling

Using a reducer

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS SYSTEMS INC.

B

    939 NATHANIEL TRAIL    WARWICK, PA 18974

BDS

 

SYSTEMS INC.

Содержание 740SPCU-1220

Страница 1: ...t through the supplied compression fitting Tighten fitting after wiring is complete 5 Check all wiring is correct and secure before securing Control Units cover FRAME INSTALLATION GUIDE TOP BEACON Cha...

Страница 2: ...l Unit as follows a First connect the battery to the proper terminals on the SL 10 Solar Controller Plus wire to terminal of battery negative wire to terminal of battery b Next connect the solar panel...

Страница 3: ...ON for 3 Hrs Then OFF Then ON 1 Hr before Sunrise 4 2 DAY OFF Sunset ON for 4 Hrs Then OFF Then ON 2 Hrs before Sunrise 6 2 DAY OFF Sunset ON for 6 Hrs Then OFF Then ON 2 Hrs before Sunrise D D DAY O...

Страница 4: ...ms OFF for 300ms in a repeated pattern d 15 is ON for 2 seconds OFF for 2 seconds 50 duty cycle in a repeated pattern 4 DoubleFlash 150fpm and 75fpm double flash burst a 150fpm followed by an OFF time...

Страница 5: ...t shown in this drawing Support for the bottom support pipe is By Others 3 The BDS supplied 1 ID threaded connection has a 1 315 nominal outside diameter 4 Galvanized schedule 40 pipe available at any...

Страница 6: ...n bottom bearing Delrin top bearing Delrin rain Cap Delrin bottom support bearing Notes 1 Windsock frame support rods and windsock mounting ring not shown 2 Miscellaneous screws bolts not labeled All...

Страница 7: ...ssemble two clamps to arm assembly as shown Do not tighten 5 Position arm assembly over center of solar panel pushing bottom clamps all the way down into frame and loosely tighten bottom clamp 6 Next...

Страница 8: ...code Steady Burn Flash code 001 Steady Burn Std Many other flash codes are available such as Flash code 079 2 seconds ON 2 seconds OFF Flash code 078 1 second ON 1 second OFF Flash codes can be field...

Страница 9: ......

Страница 10: ...ocks visit www LightedWindsocks com j All Items made in the USA k Inches X 2 540 cm Feet X 0 3048 mts l Cm X 0 3937 inches Meters X 3 281 feet Schedule 40 PVC sunlight resistant tubing with Delrin bea...

Страница 11: ...rnished by others No warranty is applicable on any Xenon flash tubes light bulbs LED s or any other illuminating items Items made of nylon or other cloth materials have a warranty of 90 days from date...

Страница 12: ...ld take some digital pictures of the installation and email them to us Please let us know the location details and purpose of the installation We would like to feature this on our website www LightedW...

Отзывы: