
bdiusa.com
COSMO
5720
BAR
7
Step 8 - Light Installation
Find the
rechargeable strip light H4
. Using the
Micro HDMI/USB charge cord H5
, charge the light for
6 hours. Once charged, install it onto the
metal strip
(it is held with magnets) located in the angled recess
towards the top front of the cabinet. Make sure the
proximity sensors
are facing
forward
and the light
switch is
turned on
. The light is designed to turn off automatically when the cabinet doors are closed.
Step 9 - Drawer Liner Installation / Magnetic Door Catch
Open the push-open drawer and install
middle drawer liner C6
and both
side drawer liners C7.
Using a
slotted screwdriver
, unscrew the
magnetic door catches
a few turns until they make contact
with and hold the doors shut.
H4
Rechargeable
Strip Light
C6
C7
C7
Proximity Sensors
On/Off
Micro HDMI / USB
charge cord
H5