BDEUS ERIE Series Скачать руководство пользователя страница 3

02

03

All electronics and components that need to be installed are placed in boxes under the foundation or 

attached to the frame. Before discarding the packing materials, ensure that all the parts are accounted for.

Standard Parts List

Wireless Remote

x1

Power Supply

29V 2.0A

x1

AC Power Cord

x1

Leg Assy 8"

8"

x6

Mattress Retainer Bar

x1

Optional 

Accessories 

(

universal parts

)

Not Included

x1

9V

9V

Battery Lock Wire

Not included

Not included

3"+6"

Bluetooth

x1

Sync Cord

(

single bed only)

x1

Adjustable Legs

x6

NOTE: To avoid damage to the foundation,always open the 

carton while the foundation is in the flat position.  

9V

9V

power supply with battery backup box

3.

Install legs and tighten by hand.

Two people are required to set up the foundation.

1.

Installation Guide 

Open the box

take out all the packing components.

Wireless Remote

3xBattery

x1

x1

Power Supply

(29V 2.0A)

x1

AC Power Cord

x1

x6

Mattress Retainer Bar

x1

8"

2.

Remove the foundation from the box. Make sure the floor is clean. Flat the foundation.

Leg Assy 8"

3xBattery

Not included

Battery Lock Wire

9V

9V

Not included

Отзывы: