Bdcom S2510-C Скачать руководство пользователя страница 17

BDCOM S2510-C Hardware Installation Manual

- 14 -

Chapter 4 Maintaining Switch

Caution:

1)

Before opening the machine box, make sure that you have released the static

you carried and then turn off the power on-off of the switch. Before operating

any step in Appendix B, read the section “

Safety Advice

”.

2)

Before performing operations beside the power supply or on the machine box,

turn off the power on-off and plug out the power cable.

4.1 Opening the Machine Box

This section describes how to open the cover of the switch, required tools and

operation methods.

Caution:

When the power cable still connects the power supply, do not touch it.

When you open the cover the switch, you may use the following tools:

Crossed screwdriver

Static armguard

Perform the following steps to open the cover of the switch:

(1)

Turn off the power on-off of the switch.

(2)

Plug out all cables connected the back of the switch.

(3)

Take out the bolt from the machine box with the screwdriver.

Note:

The machine box comprises of two parts: cover and bottom.

(4)

Open the cover by holding two sides of the cover towards the direction of the

arrow key shown in the following figure:

Содержание S2510-C

Страница 1: ...BDCOM S2510 C Hardware Installation Manual...

Страница 2: ...ing 5 2 2 4 Electrostatic Discharge Damage Prevention 6 2 3 Requirements for Common Locations 6 2 3 1 Environment 6 2 3 2 Location Configuration Prevention 6 2 3 3 Cabinet Configuration 6 2 3 4 Power...

Страница 3: ...hapter 4 Maintaining Switch 14 4 1 Opening the Machine Box 14 4 2 Closing the Machine Box 15 Chapter 5 Hardware Fault Analysis 16 5 1 Fault Separation 16 5 1 1 Faults Relative with Power and Cooling S...

Страница 4: ...SFP interface GSFP interface with LINK ACT indicator CLI port A rate of 9600bps RJ45 interface Besides BDCOM S2510 C switch has one grounding column and one power input at its back Figure 1 1 Front te...

Страница 5: ...connect a computer or a terminal for monitoring and configuring the switch Figure 1 2 Back template of the BDCOM S2510 C switch Table 1 3 Parts at the back template of the BDCOM S2510 C switch No Abbr...

Страница 6: ...llation Manual 3 Operating temperature humidity 0 45 10 90 non condensing Storage temperature humidity 40 70 5 90 non condensing Power characteristics input voltage AC100 240V input frequency 50 60Hz...

Страница 7: ...u plug or dial the power line keep the power line horizontal with the power socket 2 When the lifetime of our products ends handle them according to national laws and regulations or send these product...

Страница 8: ...irect current power before operating on the machine box or working beside the power supply When the power is on do not touch the power Correctly connect the device and the power socket Only profession...

Страница 9: ...ent The switch can be installed on the desk or the cabinet The location of the machine box cabinet planning and indoor cabling are very important for normal system s function Short distance between de...

Страница 10: ...ower Requirements Make sure that the power supply has nice grounding and the power at the input side of the switch is reliable The voltage control can be installed if necessary At least a 240 V 10A fu...

Страница 11: ...the devices 3 1 Installation Flow of BDCOM S2510 C 3 2 Installing the Machine Box of the Switch The installation of the machine box has two modes Installing the machine box on the desk Installing the...

Страница 12: ...the cabinet See Figure 3 2 Figure 3 2 Installing the switch on the cabinet 3 3 Connecting the Ports 3 3 1 Connecting the Console Port The switch of BDCOM S2510 C has a console port The rate of the co...

Страница 13: ...ector of the console port Figure 3 4 Connecting the Console port and the PC of the BDCOM S2510 C switch Table 3 1 Pins of the console port NO Name Remarks 6 RXD Input 3 TXD Output 4 5 SG GND Note The...

Страница 14: ...can connect other GSFP modules through the fiber to other Ethernet terminal devices Figure 3 5 Connecting the 1000M Base TX port and other Ethernet terminals 3 3 3 Connecting Ethernet TX Ports The BD...

Страница 15: ...rk cables when it connects other Ethernet terminals Figure 3 7 Connecting the 1000 Base TX port and other Ethernet terminals Table 3 3 Definition of the pins of the gigabit RJ45 port No Pin name Remar...

Страница 16: ...g after Installation Before electrically starting up the switch perform the following checkups after the switch is installed If the switch is installed on the cabinet check whether the installation po...

Страница 17: ...describes how to open the cover of the switch required tools and operation methods Caution When the power cable still connects the power supply do not touch it When you open the cover the switch you...

Страница 18: ...Machine Box The section mainly describes how to put the cover and close the machine box Do as follows 1 Put them well according to their locations and joint them together along their sides See the fo...

Страница 19: ...e fan The working temperature of the switch is from 0 to 40 Celsius degrees If the switch is too hot check whether the air outlet and air inlet are clean and then do relative operations in section 2 3...

Страница 20: ...s always on the system is being started up When the indicator flickers the system works well 2 PWR Power indicator When the switch is powered on the indicator is on 3 LINK ACT Sp eed port indicator If...

Отзывы: