14
BD DROP SAW
OPERATION
VISE
(B)
With material in vise, tighten wing
nuts until front and back jaws are
tightly securing material.
(A)
Loosen wing nut until vise is
opened enough for material.
Inspect saw for any damage, verify electric cords are not crack or damaged. Check blade for damage.
Verify saw is on a flat, solid surface.
OPERATION
(B)
Plug-in the power cord
using a GFCI.
(E)
Turn saw OFF immediately
after finishing cutting.
(C)
Turn saw ON.
(A)
Check the power switch is in
the OFF position.
(D)
Verify proper water flow on both
sides of the blade. Lower the cut-
ting head. Perform the cut. Do not
force the saw.
Содержание 172668
Страница 15: ...15 NOTES...
Страница 22: ...22 NOTES...
Страница 23: ...23 NOTES...
Страница 24: ...24 NOTES...