
BAYKAL
EDITION NO :
APHS
40
DATE OF ISSUE :
May-2011
PAGE :
40
6.6. Maintenance & spection
!
Genaral maintenance and cleaning of the press brake requires
careful attention. Therefore the machine must be shut-off before
starting any maintenance vork.
6.6.1. Type and frequency of inspections
Inspection
Period
Responsibility
•
Lubrication
See : Lubrication Diagram
Operator
•
Oil leakage in cylinders
Daily
Operator
•
Lubrication of tooling
Daily
Operator
•
Guards against any physical
damage
Daily
Operator
•
Oil leakage in pipes, hoses
and hydraulic elements
Weekly
Operator
•
Hydraulic fluid level
Weekly
Operator
•
Cylinder connecting bolts
against loosening
Weekly
Operator
•
Safety & limit switches
against loosening, damage
Weekly
Operator
•
Slide adjusting bolts
Weekly
Operator
•
Stop time control
Every 6 months
Approved Body
•
Terminal connections
of the electrical installation
Annually
Electrician
Содержание APHS Series
Страница 18: ...BAYKAL EDITION NO APHS 18 DATE OF ISSUE May 2011 PAGE 18 Intentially left in blank...
Страница 46: ...BAYKAL EDITION NO APHS 46 DATE OF ISSUE May 2011 PAGE 46 7 LUBRICATION POINTS 1 2 3 4 5 6 7 8 9...
Страница 52: ...BAYKAL EDITION NO APHS 52 DATE OF ISSUE May 2011 PAGE 52 11 SPARE PART LIST...
Страница 53: ...BAYKAL EDITION NO APHS 53 DATE OF ISSUE May 2011 PAGE 53...
Страница 54: ...BAYKAL EDITION NO APHS 54 DATE OF ISSUE May 2011 PAGE 54 12 HYDRAULIC CIRCUIT DIAGRAM...
Страница 55: ...BAYKAL EDITION NO APHS 55 DATE OF ISSUE May 2011 PAGE 55...
Страница 56: ...BAYKAL EDITION NO APHS 56 DATE OF ISSUE May 2011 PAGE 56 13 ELECTRIC CIRCUIT DIAGRAM...
Страница 57: ...BAYKAL EDITION NO APHS 57 DATE OF ISSUE May 2011 PAGE 57...
Страница 58: ...BAYKAL EDITION NO APHS 58 DATE OF ISSUE May 2011 PAGE 58 14 ADDITIONAL MANUALS...