
E
Description of Diagnostic LEDs and CM 100
Power Up Sequence
Power Up LED Monitoring Procedure:
PLEASE REVIEW POWER UP SEQUENCE BEFORE YOU CONNECT
CM_100 TO POWER
➊
The CM 100 goes through the following sequence when it’s connected to a
properly rated power outlet using its supplied power supply and power cord:
CM 100 State
LED Activity
Diagnostics Running
11 different combinations of LED states
Diagnostics Failed
LED sequence halts on failed test
Software Running
Power LED on solid, CM OK LED blinking
Scanning (Acquire Downstream Frequency) Power LED on solid, CM OK and Broadband Sync LEDs blinking
Ranging (Acquire Upstream Frequency)
Power LED on solid, CM OK and Broadband Act LEDs blinking,
Broadband Sync LED on solid
DHCP Process (Acquire IP Address)
Power LED on solid, CM OK and Ethernet Act LEDs blinking,
Broadband Act and Broadband Sync LEDs on solid
TFTP Process (Acquire Config File)
Power LED on solid, CM OK LED blinking, Ethernet Act, Broadband
Act, and Broadband Sync LEDs on solid
Registered (Normal Operation)
Power, and CM OK LEDs on solid, Ethernet Link LED on solid if
connected to an Ethernet device, Ethernet Act and Broadband Act LEDs
under hardware control (will blink if transmit is active), Broadband Sync
LED on solid
➋
Connect the CM 100 to the power outlet
302694-C Rev 00
5
Getting Started with the CM 100 V2.0
CM 100 LEDs
Ethernet
Broadband
CM OK
Power
Link
Act
Act
Sync
Содержание CM 100
Страница 1: ...Getting Started with the CM 100 ...
Страница 2: ......
Страница 13: ......
Страница 14: ...Printed in U S A ...